Similar Projects
Gravity Sewer System Condition Assessment and Renewal and Replacement (Inflow/Infiltration - I/I) Excavated Point Repairs
Post-Bid
Hollywood, FL 33022

Civil Work Related to Taft Street Force Main Condition Assessment
Post-Bid
Hollywood, FL 33022

Lift Station #48 Rehabilitation and Force Main Replacement
Results
Less than $300,000 est. value
Cooper City, FL 33329

Bayshore Drive Intracoastal Force Main Crossing
Results
$1,500,000 to $1,900,000 est. value
Fort Lauderdale, FL 33301

Infiltration and Inflow Removal Phase 2A Lateral Repairs
Post-Bid
Hallandale, FL 33009

Raw Water Well #9 Pipeline
Results
Hallandale, FL 33009

Lyons Park Stormwater and Wastewater Improvements
Post-Bid
Pompano Beach, FL

Commercial Boulevard Force Main Replacement Project
Results
Less than $350,000 est. value
Tamarac, FL 33321

Sanitary Sewer Lateral Connection and Lateral Pipe Product
Post-Bid
Plantation, FL

District 3A Step Area 3A-N
Results
Hollywood, FL 33021

Inflow and Infiltration Phase 2A Lateral Televising and Lining Project
Infrastructure
Post-Bid
Hallandale Beach, FL

Infiltration Removal Lateral and Mainline Lining Program
Term Contract
Results
Less than $3,169,282 est. value
Pembroke Pines, FL 33025

Replacement of Hallandale Beach Force Main and Large User Meter Lum-07
Results
$2,171,973 est. value
Hollywood, FL 33022

Cleaning, Televising, Grouting and Video Capture Services
Term Contract
Results
Fort Lauderdale, FL 33301

Rehabilitation of Sewer Manholes
Results
Miramar, FL 33023

Last Updated 11/03/2021 09:14 AM
Project Title

Sanitary Sewer Collection System for District 2 Septic Tank Elimination Area 2-F

Physical Address View project details and contacts
City, State (County) FL   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,570,829
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work set forth within this solicitation document includes the furnishing of all labor, materials, equipment, services and incidentals for the construction of infrastructure site work which includes, but not limited to, the installation of a new gravity sewer system, installation of new force main, installation of new lift station, restoration of pavement, milling and restoration and all ancillary work required to complete the project.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents