Similar Projects
Last Updated | 06/14/2021 08:53 AM |
Project Title | Annual Processing of Waste Tires |
Physical Address | View project details and contacts |
City, State (County) | FL (Alachua County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Hauling |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contract to remove waste tires including passenger car or pickup tires with or without rims, commercial truck tires, tractor tires, and off-road heavy equipment tires. Objective 1.2, Policy 1.2.5 of the Solid Waste Element of the Alachua County Comprehensive Plan states, “Incinerator and mass burn facilities, no such facility will be included in the County solid waste system. The use of tires, plastics or plastic derived materials as a fuel source or as feedstock for a waste to energy facility is prohibited in the County solid waste system.” Therefore, waste tires, other than off-road heavy equipment tires, must be used for recycling. No tires received from Alachua County may be incinerated. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |