Similar Projects
Chequamegon-Nicolet National Forest - Bass Lake Recreation Area Well Replacement
Design
Rhinelander, WI 54501

Water Treatment Plant Improvements for Well No. 3
Infrastructure
Bidding
Osseo, WI

Return Activated Sludge Valve Replacements at the South Shore Water Reclamation Facility
Infrastructure
Bidding
Milwaukee, Oak Creek, WI 53154

Sump System Installation
Post-Bid
Two Rivers, WI 54241

2020 Waste Activated Sludge Pump
Post-Bid
Madison, WI 53713

Rehabilitation of Wells 15 and 17 at City Well Field
Results
Eau Claire, WI 54701

2020 Rotary Lobe Pumping Unit Purchases
Results
Madison, WI 53713

2021 Well 3 Construction
Infrastructure
Bidding
Cross Plains, WI

Well 18 Treatment
Post-Bid
Less than $160,000 est. value
Madison, WI 53713

Municipal Well 4 - Well Construction
Results
Wausaukee, WI 54177

Well No. 5 Pump House and Site Improvements
Infrastructure
Bidding
Lake Hallie, WI

Polymer Pump Nos. 4, 5 and 6 Replacement
Post-Bid
Oak Creek, WI 53154

2020 Bypass Pump Rehabilitation
Results
Milwaukee, WI

2021 Snell Road Landfill Piping and Leachate Extraction Pump Installation
Infrastructure
Bidding
Oshkosh, WI 54901

Well Station No. 5 HMO Treatment Facility & Building Modifications
Post-Bid
$2,907,000 est. value
Pewaukee, WI 53072

Last Updated 08/11/2021 12:45 PM
Project Title

2021 Water System - Well House - Contract B

Physical Address View project details and contacts
City, State (County) Arlington, WI   (Columbia County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a new well house, including a new municipal water supply well house (masonry building, well pump and associated mechanical piping, chemical feed equipment, electrical and instrumentation equipment, and diesel standby generator). Site work including paving. Extension of approximately 950 feet of 8” ductile iron water main. SCADA and controls work at two lift stations, Well No. 3, the water tower, and WWTP.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents