Similar Projects
Mobile/Handheld Meter Reading System
Infrastructure
Bidding
Huntsville, AL

Bailey Cove Road Transmission Phase 2 Project
Post-Bid
Huntsville, AL

Meter Boxes and Lids for the Madison County Water Department
Term Contract
Post-Bid
Huntsville, AL 35811

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Swing Check Valve
Results
Less than $44,800 est. value
Huntsville, AL 35804

Memorial Parkway to Mastin Lake Road Water Installation
Post-Bid
Huntsville, AL

Madison Boulevard Water and Sewer
Results
Madison, AL 35758

Swancott Road Project for Huntsville Utilities Water Department
Post-Bid
Huntsville, AL

Balch Road Box Culvert Crossing
Results
Less than $139,868 est. value
Huntsville, AL 35801

Wastewater Knife Gate Valves
Infrastructure
Post-Bid
Huntsville, AL

Western Water Transmission Main Phase 1
Results
Madison, AL 35758

Rate of Flow Controller
Infrastructure
Post-Bid
Huntsville, AL

Polypropylene (PP) and Polyethylene (HDPE) Storm Drainage Pipe
Results
Huntsville, AL 35801

Highland Drive Water Main
Results
Madison, AL 35758

Sanderson Road Drainage Improvements, Phase II
Results
Huntsville, AL

Reported 09/11/2021 12:00 AM
Project Title

Hobbs Island Road Cross Drain Replacement

Physical Address View project details and contacts
City, State (County) Huntsville, AL 35810   (Madison County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of the removal of 75 linear feet of existing 96" Corrugated Metal Pipe (CMP) and installing 75 linear feet of 96" Corrugated Metal Pipe (CMP) Aluminized 10 gauge. The scope of work includes, but is not limited to: erosion control, saw cutting existing pavement, excavating and bedding, demolishing and removing existing CMP, headwalls, and pavement, installing 96" CMP Aluminized 10 gauge, headwalls, and wingwalls, installing Class 2 riprap, stabilization of existing utilities, stabilization or removal of existing 30" water main (Ductile Iron Pipe) and 10" water main (PVC), installing 30" water main (Ductile Iron Pipe) and 10" water main (PVC) (Materials to be provided by Huntsville Utilities) (only if pipe is needed to be removed to complete the project).

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents