Similar Projects
The Piazza at Former Star City Site - Master Plan
New Construction - 51,100 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Bridgeville, PA 15017

Town Homes and Park Area
New Construction
Conception
Murrysville, PA 15668

The Residences of Providence Town Center
New Construction - 93,470 SF
Design
Oaks, PA 19456

Pittsburgh Penguins Former Arena Site - Entertainment Facility by Live Nation and Parking Garage
New Construction - 40,000 SF
Design
$3,000,000 est. value
Pittsburgh, PA 15219

Green Infrastructure Improvements Project
Post-Bid
Duncansville, PA 16635

Scranton Veterans Memorial Park Project Phase II
New Construction
Post-Bid
$399,999 est. value
Scranton, PA 18503

New Tennis Facility
Results
Danville, PA 17821

Rochester Area Parks Rehabilitation War Memorial Park
Results
Rochester, PA

The Highlands at Wyomissing Expansion
Renovation, Addition - 6,000 SF
Construction
Wyomissing, PA 19610

Nova Place
Renovation - 26,000 SF
Construction
$2,700,000 est. value
Pittsburgh, PA 15212

3 Crossings Phase 2 - Building B - Office, Retail and Riverfront Plaza
New Construction - 100,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Pittsburgh, PA 15222

Dover Highlands Multi Family Homes
New Construction - 12,750 SF
Design
Dover, PA 17402

Culliton Park
Post-Bid
Lancaster, PA 17603

2019 Tennis Court Rehabilitation Project
Results
Wampum, PA 16157

The Stacks at 3 Crossings
New Construction - 128,000 SF
Construction
$16,000,000 est. value
Pittsburgh, PA 15222

Last Updated 05/19/2020 04:41 PM
Project Title

Pottsville Center Safety & Play Area Improvements

Physical Address View project details and contacts
City, State (County) Pottsville, PA 17901   (Schuylkill County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method
Project Status Construction Commenced May 2020, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of three (3) sections: (1) Concrete Sidewalks, Curbing, retaining/cheek walls and drainage a. Concrete sidewalks on N. 7th Street with curbing b. Retaining walls – will include areas for fence installation c. Drainage of play area and preparation of site for artificial turf. (2) Fencing – installation of 6’ black vinyl coated fencing on N. 7th Street, 4’ fencing on all other areas of play space (3) Artificial Turf – installed in Play Area 1, per diagram/instructions.

Details

Park/Playground, Renovation.
Division 22 - Plumbing, Facility Storm Drainage.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents