Similar Projects
Skinner Trail Resurfacing
Infrastructure
Design
$25,000 to $100,000 est. value
Amherst, MA 01002

Crosswalk and Handicap Improved Mobility Program
Post-Bid
Amherst, MA

Campus Hardscape Repair and Excavation Service
Infrastructure
Post-Bid
$1,000,000 est. value
Amherst, MA

Sidewalk and ADA Improvements at Various Locations
Results
Less than $1,148,661 est. value

Reconstruction of Parking Lot and Sidewalk, Capawonk 667-1
Results
$178,345 est. value
Hatfield, MA 01038

Parking Lot 65 Holdsworth
Infrastructure
Post-Bid
$277,000 est. value
Amherst, MA

PVTA Parking Lot Improvements
Results
$735,000 est. value
Amherst, MA 01059

Parking Lot 28 Improvements
Infrastructure
Post-Bid
$4,300,000 est. value
Amherst, MA 01002

Bituminous Sidewalk Replacement
Results
Less than $24,803 est. value
Easthampton, MA 01027

Trail Restoration, Trail Building Consisting of Corridor Clearing, Tread Work, Boardwalk (Bog Bridges) Construction, Stair Building and Construction of a Viewing Platform
Infrastructure
Post-Bid
$38,000 est. value
Southampton, MA

Western Ma Road and Trail Improvements
Results
$4,000,000 est. value
Franklin, Hampden, Worcester, MA

Belchertown Town Hall Parking Lot Re-Construction and Improvements
Infrastructure
Post-Bid
$90,000 est. value
Belchertown, MA 01007

Roundhouse Parking Lot Rehabilitation
Results
$900,000 est. value
Northampton, MA

Campus- Hardscape Repair and Excavation Services
Infrastructure
Post-Bid
$1,000,000 est. value
Amherst, MA

Bangs Center Accessibility Improvements
Infrastructure
Results
Amherst, MA 01002

Last Updated 06/19/2022 11:51 PM
Project Title

Ware Mass Central Rail Trail Phase II

Physical Address View project details and contacts
City, State (County) Ware, MA   (Hampshire County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $80,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This phase of the project is to install a stone dust surface on the trail to complete the portion of the Mass Central Rail Trail between Longview Avenue and Mountain View Drive. This work will include approximately .75 miles of the MCRT trail, involve grading for drainage, and grading near two bridge crossings for ADA accessibility

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents