Similar Projects
Construction of 2017 Newington CDBG
Post-Bid
Newington, GA

FY 2019 Southeast WWTP Improvements
Post-Bid
Douglas, GA

Flat Creek WRF Sludge Storage Addition
Results
Less than $1,473,750 est. value
Gainesville, GA 30501

RM Clayton WRC Digester Improvements and Rehabilitation Phase One
Results
Atlanta, GA 30318

Mineral Springs Wastewater Treatment Plant Expansion to 0.95 MGD
Construction
Less than $6,000,000 est. value
Newnan, GA

WWTP Improvements and Glynn Addy Pump Station Rehabilitation
Construction
$3,500,000 est. value
Stockbridge, GA

Westside WWTF Improvements
Post-Bid
Eatonton, GA

2018 Wastewater System Capital Improvements
Results
$2,500,000 est. value
Cedartown, GA

Wastewater Treatment Plant Maintenance and Upgrades
Post-Bid
Less than $650,000 est. value
Darien, GA

A. Scott Emmons WRF at the Little River
Term Contract
Results
Less than $140,000 est. value
Covington, GA

Big Flat Creek WRF 3.33 MGD Upgrade
Post-Bid
Loganville, GA 30052

Wastewater Treatment Facility Improvements
Results
$1,200,000 est. value
Hiawassee, GA 30546

Big Flat Creek WRF - Highway 81 Entrance Security Improvements
Post-Bid
Loganville, GA 30052

UV Disinfection System Replacement
Results
Less than $164,927 est. value
Statesboro, GA 30458

Belt Press Replacement Bear Creek WPCP
Post-Bid
Hampton, GA 30228

Reported 02/16/2019 12:00 AM
Project Title

Eastside WWTF Improvements

Physical Address View project details and contacts
City, State (County) Eatonton, GA   (Putnam County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description The work shall generally consist of furnishing all products and performing all labor necessary to perform the following Replacement and refurbishment of existing aeration and mixing equipment in aeration basins; addition of a secondary clarifier; and replacement of flow splitter box. In addition, provide electrical and mechanical services, conduit, wiring, equipment and fixtures and all other incidental items as required to complete the work, including yard piping, concrete work, dewatering, earthwork, valves and other devices and mechanical items.
Details
Division 02 - Existing Conditions, Subsurface Investigation, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents