Similar Projects
Village Green Apartments - Clubhouse and Pool
New Construction - 14,910 SF
Conception
Mount Olive, NJ 07828

Waterview Boulevard Child Care Facility
New Construction - 11,560 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Parsippany, NJ 07054

Verona Gardens
New Construction - 23,650 SF
Design
Lakewood, NJ 08701

The Learning Experience
New Construction - 14,608 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Watchung, NJ 07111

Construction of Community Park Playground Improvements
Post-Bid
Cedar Grove, NJ

Morris Knolls High School Middle Field Refurbishment Project
Post-Bid
Rockaway, NJ 07866

MSE Berm Construction Phase 1
Results
Egg Harbor Township, NJ

Brookside Park Playground and Restroom Building Improvements
Results
Scotch Plains, NJ

The River Club
New Construction - 8,000 SF
Construction
$100,000,000 est. value
Bogota, NJ 07603

Brittin Village Apartments
New Construction, Demolition - 3,010 SF
Construction
$500,000 to $1,000,000 CJ est. value
Pennsauken, NJ 08109

Montclair Kimberly Academy - Athletic Fields Renovation Project
Renovation
Conception
Montclair, NJ 07042

The Learning Experience
New Construction, Demolition - 17,967 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Summit, NJ 07901

Primrose Child Care Center
New Construction, Demolition - 12,215 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Pluckemin, NJ 07921

Miller Stadium Field Improvements
Results
West New York, NJ 07093

Char Burger & Creamery
Renovation - 3,868 SF
Construction
$649,000 est. value
Bridgewater, NJ 08807

Reported 02/12/2020 12:00 AM
Project Title

Installation of New Foul Pole and Netting at the Softball Field

Physical Address View project details and contacts
City, State (County) Glassboro, NJ   (Gloucester County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes, but is not limited to, the following: 1. Installation of six (6) new 40’ high poles starting at the dugout on the third base side, replacing the existing back stop poles and down just past the second set of bleachers on the first base side. The start and stop point of the new poles is indicated by red asterisk * on the marked up plans. Installation shall include new cabling, hardware and netting 2. Existing poles, netting, chain link fencing, concrete pole bases and hardware from the third base dugout to the backstop around to the first base dugout shall be demolished by this contractor. 3. Contractor shall install new 4’ high chain link fencing at the base of the backstop to match the existing fencing. Fencing shall by sturdy enough so the existing 4’ high padding at the Softball field can be reinstalled by the contractor. 4. The existing poles along the 3rd base line at the intersection point of the third base dugout where the new 40’ poles start shall remain. Contractor shall install new cabling, hardware and netting. 5. The new netting along the third base side shall have a large enough access opening for field prep equipment access (mowing, infield work, etc.). 6. This shall be a turnkey installation including all materials, delivery, labor, equipment, excavation, site work/restoration, concrete foundations, rebar, saw cutting, backfilling, etc. 7. This a design build project and contractor shall be responsible for submitting stamped engineered permit drawings to the DCA for review and approval prior to any work commencing. Engineering drawings and calculations shall be stamped by a registered NJ Professional Engineer. Drawings shall be designed to meet or exceed the appropriate codes of 155 mph Exposure C Category 2. Engineer shall also determine appropriate footing sizes and depths for the 40’ high pole installations. Contractor shall pay for all permit fees associated with the project. Contractor shall provide all permit documentation to Rowan prior to work commencing onsite and final permit acceptance documentation before final payments are made. 8. Rowan will be hiring a testing agency to manage 3rd party inspections for the project to ensure the design intent submitted as part of the engineered drawings is met. 9. Any work shown on the IFB drawings and specifications associated with the Baseball Field is not part of this project.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents