Similar Projects
Engineering, Planning and Development
Post-Bid

C1na--523A5-21-002 Design Replace Fuel Pumps
New Construction
Post-Bid
Brockton, MA 02301

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

USCG Ocean Architect/Engineering IDIQ MATOC
Results
$3,500 to $2,500,000 est. value

C--Multiple Award Task Order Contract (MATOC)
New Construction, Term Contract
Post-Bid

C--Commissioning Authority (CXA) Services for the EPA
Results
$25,000 to $100,000,000 est. value

Microgrid Architectural And General Engineering Services
New Construction, Term Contract
Post-Bid
$10,000,000 est. value

Nationwide Architect and Engineering IDIQ - Small Business Pool
Results
Less than $10,000,000 est. value

C1lb--523A5-13-889 Improve Roadway Systems & Parking Lots Campus Wide Ph-4
Renovation
Post-Bid
$3,500,000 to $5,000,000 est. value
Brockton, MA 02301

Water Tank Inspections, OCONUS and CONUS
Results
$10,000 to $5,000,000 est. value

Owners Project Manager Services
Renovation, Term Contract
Post-Bid

NGB Fire Protection - National Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Results
$70,000 to $10,000,000 est. value
Washington, DC

C1da--523A5-21-002 Design Fuel Pump Replacements
Term Contract
Post-Bid
$100,000 to $990,000 est. value
Brockton, MA 02301

Multimedia Environmental Compliance Engineering Support for Navy, Marine Corps, and other DOD Installations, and Federal Agencies
Results
Norfolk, VA

Public Safety Facilities Feasibility Study
New Construction
Post-Bid
Less than $150,000 est. value
Wareham, MA

Last Updated 10/07/2022 09:11 AM
Project Title

RFQ Design - Town House ADA upgrades and Sprinkler Design

Physical Address View project details and contacts
City, State (County) Marion, MA 02738   (Plymouth County)
Category(s) Professional Services
Sub-Category(s) Architectural
Contracting Method Competitive Bids
Project Status Request for Qualifications, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Seeking to hire a design engineer for the next phase of the town hall restoration project. This phase will include ADA upgrades on the first floor and Sprinkler design throughout the building. Town House ADA upgrades and Sprinkler Design. Direct any questions to Donna Hemphill at dhemphill@marionma.gov or tel. 508-748-3520. Time Period for Completed Project Winter/Spring 2022-2023 The method of contractor selection has not been determined at this time.

Details

Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents