Similar Projects
Old Cutler Village Apartments Phase 2
New Construction, Infrastructure
Conception
$104,100,000 CJ est. value
Miami, FL 33190

Old Cutler Village Apartments Phase 2
New Construction, Infrastructure
Conception
$104,100,000 CJ est. value
Miami, FL 33190

Brownsville Transit Village Phase 5
New Construction, Infrastructure - 99,854 SF
Design
$45,000,000 CJ est. value
Miami, FL 33142

Brownsville Transit Village Phase 5
New Construction, Infrastructure - 99,854 SF
Design
$45,000,000 CJ est. value
Miami, FL 33142

Publix #1770 - Riviera Plaza / Coral Gables
New Construction, Infrastructure - 52,363 SF
Post-Bid
$10,000,000 CJ est. value
Coral Gables, FL 33146

Publix #1770 - Riviera Plaza / Coral Gables
New Construction, Infrastructure - 52,363 SF
Post-Bid
$10,000,000 CJ est. value
Coral Gables, FL 33146

New Park Improvements at Robert C. Welsh JR. Park
Infrastructure
Results
$185,408 CJ est. value
South Miami, FL 33143

Correct Water Intrusion, JL King Justice Bldg, Miami
Infrastructure
Results
$1,000,000 to $5,000,000 est. value
Miami, FL 33132

Alton Bay Condominium Tower / Miami Beach
New Construction, Infrastructure - 197,780 SF
Construction
$10,000,000 CJ est. value
Miami Beach, FL 33140

Alton Bay Condominium Tower / Miami Beach
New Construction, Infrastructure - 197,780 SF
Construction
$10,000,000 CJ est. value
Miami Beach, FL 33140

Collins Avenue Condominiums
Demolition, New Construction, Infrastructure, Renovation
Pending Verification
$20,700,000 CJ est. value
Surfside, FL 33154

Collins Avenue Condominiums
Demolition, New Construction, Infrastructure, Renovation
Pending Verification
$20,700,000 CJ est. value
Surfside, FL 33154

Treasure Island Elementary School Community Park - Construction - CP23-07 - North Bay Village
New Construction, Infrastructure
Conception
$2,703,546 CJ est. value
North Bay Village, FL 33141

Mandarin Park
New Construction, Infrastructure - 87,500 SF
Design
$75,000,000 CJ est. value
Homestead, FL 33033

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Last Updated 10/13/2023 09:04 PM
Project Title

Intersection Improvements Contract -Multiple Sites

Physical Address View project details and contacts
City, State (County) Miami, FL 33132   (Miami-Dade County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

A. Work under this Contract includes furnishing of all supervision, labor, materials, tools, equipment and performing all operations necessary for Intersection Improvements. B. Work includes but is not limited to, the following: Construction of Asphaltic Concrete Road base and surface; pavement removal; pavement milling; pavement markings; signage; drainage; sidewalks; concrete curb and gutter; and traffic calming devices. Incidental items required for areas such as street light, traffic signal installation, etc. may be added to this Contract. The actual location(s) of work shall be identified in the Work Order(s) issued subsequent to the Award of the Contract. The combined total cost for all work authorized by the Work Order(s) shall not exceed the Contract Award amount. The Department does not guarantee that the full amount of the Contract will be issue to the Contractor. The actual amount of Work orders assigned will be the prerogative of the department in its sole discretion and dependent only upon its needs.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents