Similar Projects
Stansbury Park Well 5 Equipping Project
Renovation, Infrastructure
Bidding
Erda, Stansbury Park, UT 84074

Stonebridge Maintenance Variable Speed Pump Station Replacement
Post-Bid
West Valley City, UT 84120

Industrial Lift Station Rehab and Piping Upgrades
Post-Bid
Salt Lake City, UT

Under Canvas Booster Pump Station
Results
Less than $200,000 est. value
Big Water, UT 84741

Pump Replacement for JBM Pump Station
Results
Less than $198,844 est. value
Herriman, UT

City Creek Pump Station and Pipeline
Construction
Saint George, UT

Zone 2 and 3 Pump Station and Pipeline Project
Post-Bid
Herriman, UT 84096

SW Regional Lift Station
Results
Spanish Fork, UT

Booster Pump Station #2 Rehabilitation
Post-Bid
Ogden, UT 84310

SLC WRF Influent Pump Rebuild Project
Results
Less than $369,000 est. value
Salt Lake City, UT

Booster Pump Station #3 Rehabilitation
Post-Bid
Ogden, UT 84310

Industrial Sewer and Lift Station Abandonment
Results
Less than $1,811,150 est. value
Provo, UT

Public Works SCADA System Upgrade 2021
Post-Bid
$385,000 est. value
Lindon, UT

UDOT Hot Springs MS4 (Willard)
Demolition
Results
Willard, UT 84340

20E Pioneer WWPS Replacement Project
Renovation
Post-Bid
$1 to $3,400,000 est. value
West Valley City, UT

Reported 03/04/2022 12:00 AM
Project Title

Pump Station Project

Physical Address View project details and contacts
City, State (County) Syracuse, UT   (Davis County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The North Davis Sewer District (NDSD) Pump Station Project is the second part of a larger project involving the relocation of the sewer treatment plan's effluent discharge from Farmington Bay to Gilbert Bay. Part one consists of a 6.25-mile long, 63-inch diameter HDPE pipeline currently under construction. Part two of the project is the design and construction of the pump station.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents