Similar Projects
Oasis Water Treatment Plant Improvements - CIPWA61055 - City of Glendale
Infrastructure
Conception
Glendale, AZ 85303

D/B - Replace Water Storage Tanks for Fire Suppression System
Infrastructure
Bidding
$100,000 to $250,000 est. value
Sierra Vista, AZ 85613

Livestock Storage Tanks
Post-Bid
Aguila, AZ

Hospital Hill Tank Renovation
Post-Bid
Hayden, AZ

World-Wide Water Storage Tank Remediation
Term Contract
Results

World-Wide Water Storage Tank Remediation
Term Contract
Results

Tank Inspection, Repair, and Coating
Alteration
Post-Bid
Glendale, AZ

H379--Clean & Inspect Potable Water Tank
Results
Tucson, AZ 85723

Cactus Forest Water Distribution System Replacement
Infrastructure
Post-Bid
AZ

Water Storage Tanks Cleaning, Inspections and Repairs
Results
$250,000 to $500,000 est. value
Sells, AZ

Welded Steel Water Tank
Infrastructure
Post-Bid
Cottonwood, AZ

Pefo Replace Water Tank Ladder
Results

Bolted Steel Water Tank
Infrastructure
Post-Bid
Cottonwood, AZ

Demolition of Existing Steel Water Storage Tank
Results
Canyon Day, AZ - Albuquerque, NM 85941

Cathodic Protection Maintenance
Term Contract
Post-Bid
Peoria, AZ

Reported 06/24/2022 08:20 AM
Project Title

Underground Storage Tank Replacement - Cipfc19037 - City Of Glendale

Physical Address View project details and contacts
City, State (County) Glendale, AZ 85301   (Maricopa County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $615,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is for replacement of aging below-ground double-walled vaulted fuel storage tanks located at the Operations Complex, as well as associated piping. The tanks are tested at regular intervals, and are anticipated needing replacement in FY23. This project is included in the city's 2023-2032 Capital Improvement Plan (CIP). As of June 23, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents