Similar Projects
Brookview Village - Expansion Phase III
Infrastructure
Design
$500,000 to $1,000,000 est. value
Greenfield Center, NY 12833

West Main Street Pump Station Electrical Upgrades
Alteration
Bidding
Pawling, NY 12564

IDIQ Contract for Water Main Repair - Various Citywide Developments
Infrastructure
Bidding
New York, NY

Snowmaking Prefabricated Pump Station
Post-Bid
NY

Purchase of Hymax Couplings
Post-Bid
Albany, NY 12207

Shared Water Improvements
Results
Less than $115,000 est. value
Champlain, NY

CM Services - Riverfront Pump Station
Term Contract
Results
Albany, NY 12242

IDIQ Contract for Water Main Repair - Various Citywide Developments
Infrastructure
Bidding
Jamaica, New York, NY 10461

Pipe,Fittings and Hydrants for 2020
Term Contract
Post-Bid
Latham, NY 12110

North Utility Corridor Upgrade
Term Contract
Results
Lewiston, NY

Carmel Water District 2 - Water Main Lining Project Phase 2
Infrastructure
Bidding
Carmel, NY

Pipes, Fittings, Hydrants and Valves
Post-Bid
Saratoga Springs, NY 12866

Hagan Town Pump Station Abandonment and Replacement
Results
$543,288 est. value
Poughkeepsie, NY 12603

IDIQ Contract for Water Main Repair - Various Citywide Developments
Infrastructure
Bidding
New York, NY

Gorge Pump Station Rehabilitation Niagara Falls Water Board
Post-Bid
Niagara Falls, NY 14304

Last Updated 08/23/2021 03:09 PM
Project Title

Water System Improvements

Physical Address View project details and contacts
City, State (County) Candor, NY   (Tioga County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done under this project shall include the installation of new ductile iron watermain along various streets within the Village to replace undersized and aging watermain, improvement of two (2) groundwater well houses, installation of backup generation, installation of a new booster pump station, upgrades to the water system controls and associated restoration of all disturbed areas.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents