Similar Projects
Twin Valley Road Improvements
Infrastructure
Bidding

Portage - Fox Lake, 0.13 Mi. e. Of Jackson Street To Sth 22
Infrastructure
Bidding
$2,000,000 to $2,999,999 est. value
WI

Columbia County Road Improvements
Renovation
Post-Bid
Columbus, WI

Wendt Road in Town of Columbus and Berkvam Road in Town of Otsego
Renovation
Post-Bid
Columbus, WI

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Health Care Center Sidewalk
Infrastructure
Bidding
Wyocena, WI 53969

2021 Chip Seal
Post-Bid
$82,938 est. value
Portage, WI

I-39 - Columbus, North Street to School Street
Results
Columbus, WI 53925

2022 Street & Utility Improvements
Infrastructure
Bidding
Poynette, WI 53955

2021 Sidewalk Improvement Project
Post-Bid
$103,605 est. value
Portage, WI

C. Portage, Wisconsin and Dewitt Sts, Ontario Street to E. Pleasant Street
Results
Portage, WI 53901

2021 Pavement Rehabilitation
Post-Bid
$186,388 est. value
Portage, WI

2021 Gay Street Improvements
Results
Lodi, WI 53555

Crack Fill, Emulsified Sealer/Binder and Pavement Marking
Post-Bid
Wisconsin Dells, WI 53965

Last Updated 03/22/2022 10:53 AM
Project Title

2022 Street Reconstruction

Physical Address View project details and contacts
City, State (County) Fall River, WI 53932   (Columbia County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Relay 2,340 ft of clay sanitary sewer with 2,460ft of 8” PVC sewer, relay 2,700ft of transite watermain with 3,080ft of 8” ductile iron watermain, and construct 1,130ft of RCP storm sewer including installation of curb inlets along Church Street from Fox Trail to Jennifer Lane, along Fox Trail between Church Street and Kane Street, along Sunrise Lane from Church Street to 900ft south of Church Street, and Hilltop Drive from Church Street to 700ft south of Church Street. This section of street includes new curb and gutter, geotextile fabric, breaker run, gravel, asphalt (partially funded by Local Road Improvement Program – LRIP), and new sidewalk, replacement of the sewer and water laterals, erosion control, traffic control, and yard restoration.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents