Similar Projects
Pump Station 25 and 88 Permanent Bypass Pump
Bidding
Newport News, VA

Rehabilitation Of Sanitary Sewer Lift Station At Concourse B, IAD
Renovation
Bidding
$250,000 to $300,000 est. value
Dulles, VA

Route 50 Pump Station Replacement
Post-Bid
Winchester, VA

Plaza Bethune Pump Station No. 519 Replacement and Force Main Rehabilitation
Post-Bid
Less than $1,773,150 est. value
Virginia Beach, VA 23456

Building 508 Repair Wet Well Pump Station
Results
$500,000 to $1,000,000 est. value
Portsmouth, VA

Johnson Creek Wastewater Pump Station
Results
$8,067,444 est. value
Chester, VA 23836

Smith Farms Sanitary Sewage Pump Station
New Construction
Construction
$75,000 est. value
Yorktown, VA 23693

Anderson Water Pump Station VFD Upgrades
New Construction
Bidding
Chesterfield, VA

Crozet Flow Equalization Tank and Pumping Station Upgrade
Post-Bid
Charlottesville, VA

Construction of Arts and Conference Center Pump Station 114
Results
$1,000,000 to $2,999,999 est. value
Virginia Beach, VA 23456

Pump Station 50 and 67 Rehabilitation
New Construction - 515 SF
Bidding
Suffolk, VA 23434

Pump Station 23 Service Area Phase 8
Post-Bid
Norfolk, VA

Oak Forest Pump Station Abandonment Project
Results
$959,491 est. value
Charlottesville, VA 22900

Middle Chickahominy Wastewater Pump Station (WWPS) Upgrades
New Construction
Bidding
VA

Kings Trail Pump Station 234 Replacement
Post-Bid
Virginia Beach, VA

Last Updated 05/28/2021 09:43 AM
Project Title

Gateway Business Park Grinder Pump Station

Physical Address View project details and contacts
City, State (County) VA   (Spotsylvania County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of furnishing and installing approximately 830-feet of 8” PVC gravity sewer pipe, approximately 865-feet of 2.5” PVC force main sewer pipe, approximately 20 feet of 8” ductile iron water line, Grinder Pump station, emergency generator and all necessary appurtenances to complete the project. The successful Contractor shall perform all construction activities and provide all construction management, necessary tools, equipment, materials, fuel, insurance, personnel, and supervision to complete the Project.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents