Similar Projects
Harvest Meadows Phase Two - Water, Wastewater and Drainage Improvements
Post-Bid
Buda, TX 78610

Sunfield Phase 3 Section 6A Street, Drainage, Water, Wastewater, and Utility Improvements, The Sunfield Phase 3 Section 6B Street, Drainage, Water, Wastewater, and Utility Improvements; Sunfield Phase
Post-Bid
Buda, TX

Z--San Marcos Pond Yard Water Valves Replacement
Results
$100,000 to $250,000 est. value
San Marcos, TX 786661024

Trails at Windy Hill Phase 2
Results
TX

Construction Package #3 - Waterline Improvements & ARV Installation
Post-Bid
Less than $3,360,000 est. value
San Marcos, TX 78666

Blanco River Waterline Improvements
Results
San Marcos, TX 78666

Sunfield Phase 3 Section 5C Street Improvements and Sunfield Phase 3 Section 5C Drainage, Water, Wastewater, and Utility Improvements
Post-Bid
TX

Main Lift Station Force Main Replacement
Results
$7,400,000 est. value
San Marcos, TX 78666

Parten Ranch, Phase 5 Paving, Drainage, Water and Wastewater Improvements
Post-Bid
Dripping Springs, TX 78620

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

2020 CCSUD TWDB Projects Scada Consultant Services
Post-Bid
San Marcos, TX 78666

Sportsplex Wastewater Line Upsize Project
Results
Less than $253,902 est. value
Buda, TX 78610

Plum Creek Marketplace Avenue Phase 2 - Water, Wastewater, Drainage, and Paving Facilities
Post-Bid
TX

Hunter Road Pipeline Improvements and Nelson Transmission Line Project
Results
$690,000 est. value
San Marcos, TX 78666

Driftwood Club Core Phases 1 and 2 Paving, Drainage, Water, Wastewater, and Rainwater Collection System Improvements
Post-Bid
Driftwood, TX 78619

Last Updated 12/17/2019 03:32 PM
Project Title

Replace Influent Chiller-2019

Physical Address View project details and contacts
City, State (County) San Marcos, TX 78666   (Hays County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $95,000 to $108,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Provide and install ONE NEW REPLACEMENT PACKAGED WATER CHILLER for stand-by operations. It shall also include a factory provided hydronic package including water circulating pumps, expansion tank, water storage tank, freeze protection package. 2. Replace well water piping with larger pipe to increase the flow of well water to the hatchery. This shall include replacing existing well water temperature control components with larger components to allow for the increased water flows. This shall include making the necessary control parameter adjustments to provide a fully functional well water temperature control system. 3. Start-up, test, document and make appropriate adjustments to show new water chiller system operates properly and all the chiller safeties are adjusted to allow the chiller to function properly and reliably. 4. All work shall comply with the specifications and as shown on the drawings herein

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks, Packaged Water Chillers.
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 42 - Process Heating, Cooling, and Drying Equipment, Process Chillers and Coolers.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents