Similar Projects
Jackson Street Jefferson Street and Church Street Water Line Replacement
Infrastructure
Bidding
$757,000 est. value
West Unity, OH 43570

2022 Private Lead Service Lateral Replacement Program
Infrastructure
Bidding
$200,000 est. value
Watertown, OH

Market Survey DLA DSCC Water Line Renovation Project
Post-Bid
$1,000,000 to $5,000,000 est. value
Columbus, OH

Waterline Replacement
Post-Bid
Less than $138,700 est. value
Syracuse, OH 45779

Glyco II Forcemain Replacement - Contract A
Results
$1,622,193 est. value
Painesville, OH

SR 571 Bridge Water Main Insulation
Results
Less than $96,000 est. value
West Milton, OH 45383

Sheldon Water Main Replacement
Post-Bid
$1,004,792 est. value
OH

Construction Inspection and Construction Administration Services Eastern Pressure District Waterline Upgrades
New Construction - 2,740 SF
Results
Less than $8,065,000 est. value
Springfield, OH 45502

Water System Improvements Phase II
Infrastructure
Post-Bid
$549,000 est. value
Windham, OH

Madeira 2021 Waterline Replacement Phase 2
Results
Less than $1,617,436 est. value
Madeira, OH 45243

Center Street Improvements Phase 4
Infrastructure
Post-Bid
$375,000 est. value
Farmersville, OH 45325

Water Booster Station
Results
Less than $310,770 est. value
West Milton, OH 45383

Fire Hydrants and Fire Hydrant Parts
Infrastructure
Post-Bid
Cleveland, OH

Southerly Primary Settling Tanks 1- 10 Flush Valves
Results
Less than $2,600,000 est. value
Cleveland, OH

Water Line
Infrastructure
Post-Bid
South Point, OH 45680

Last Updated 05/13/2022 12:07 PM
Project Title

Walbridge Main Street Waterline Improvements

Physical Address View project details and contacts
City, State (County) Walbridge, OH 43465   (Wood County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $604,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

For the furnishing of the necessary materials and construction of the Walbridge Main Street Waterline Improvements. The scope of work consists of installing approximately 2,200 lineal feet of 8" PVC pipe installed by open cut to replace 6" waterline.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents