Similar Projects
Oasis At Lakewood Ranch
New Construction - 50,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Bradenton, FL 34202

Sandpiper Place
New Construction
Conception
Bradenton, FL 34203

Peninsula Bay - Master Plan
New Construction
Design
Cortez, FL 34210

Heritage Harbour Masterplan
New Construction - 958,837 SF
Design
Bradenton, FL 34201

The Collection
New Construction - 56,059 SF
Post-Bid
$12,495,600 est. value
Sarasota, FL 34236

Shoreview Apartments - Phase Two
New Construction - 88,186 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Bradenton, FL 34208

Risdon on 5th
New Construction - 46,000 SF
Construction
$5,000,000 est. value
Sarasota, FL 34236

Oasis at Sarasota
New Construction
Construction
$20,000,000 to $25,000,000 est. value
University Park, FL 34201

The Addison Phase 2
New Construction
Conception
Bradenton, FL 34208

Lincoln VIllage
New Construction, Demolition
Design
Bradenton, FL 34208

Co-Developer Services
Post-Bid
Sarasota, FL 34230

The Green Apartments At Lakewood Ranch
New Construction
Construction
$35,372,475 est. value
Bradenton, FL 34202

Apartment Complex
New Construction
Conception
Sarasota, FL 34232

Oaks At Creekside
New Construction - 4,300 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Bradenton, FL 34203

The Addison
New Construction, Build-Out - 2,000 SF
Construction
Bradenton, FL 34208

Last Updated 06/19/2019 02:51 PM
Project Title

Bonita Vista

Physical Address View project details and contacts
City, State (County) Palmetto, FL 34221   (Manatee County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method
Project Status Construction Commenced August 2018, Construction Completion Expected September 2019
Bids Due View project details and contacts
Estimated Value $2,000,000 to $2,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description
Details 1 Apartments/Condominiums, 3 Stories Above Grade, 27,717 SF New Construction 18 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents