Similar Projects
Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

Major Reconstruction-Ham-Ir 275-28.69
Infrastructure
Bidding
OH

Four Lane Resurfacing - HAM-IR 71-16.66
Infrastructure
Bidding

2020 Street Reconstruction, Resurfacing, Curb Removal and Replacement Project
Post-Bid
Fairfax, OH

Chester Road Repair and Resurfacing Project - Phase 1
Post-Bid
Woodlawn, OH 45215

Major Reconstruction - HAM-74 - 18.01
Results
Cincinnati, OH 45203

Harrison Avenue Improvements
Results
North Bend, OH

Safety Center and Public Works Parking Lots Project
Infrastructure
Bidding
Montgomery, OH

Sidewalk - HAM Mt. Healthy SRTS 2017
Post-Bid
Mount Healthy, OH

Winton Road Improvements
Results
Greenhills, OH

Larchview Drive and Plainfield Road Improvements
Infrastructure
Bidding
$3,832,840 est. value
Cincinnati, Dillonvale, OH 45236

Vera, Elbrook and Vera Service Drive Improvement
Post-Bid
Golf Manor, OH

Delhi Township Rehabilitation and Repair Project
Results
Less than $885,423 est. value
Cincinnati, OH 45200

New Parking Lot
Post-Bid
Cincinnati, OH 45238

Anderson Township 2020 Curb Replacement
Results
Less than $1,500,000 est. value
Anderson, OH

Last Updated 08/09/2021 03:25 PM
Project Title

Streetscape at College Hill Station

Physical Address View project details and contacts
City, State (County) Cincinnati, OH 45245   (Hamilton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Construction Manager to Subcontract.
Project Status All Sub-Bids Received, Construction Start Expected September 2021, Construction Completion Expected fourth quarter 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager as Contractor (CMc)
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes removal and replacement of sidewalks and curbs, new brick pavers, signage and parking meters, and decorative street lighting along portions of Hamilton Ave and West North Bend Road in College Hill, adjacent to the new College Hill Station mixed-use buildings currently under construction, and an adjacent future development parcel.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents