Similar Projects
Last Updated | 11/25/2020 10:32 AM |
Project Title | CACO - Installation and Hookup of Well |
Physical Address | View project details and contacts |
City, State (County) | Truro, MA (Barnstable County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Pumps and Wells |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Provide water well, complete, as described below, and in accordance with ATTACHMENT NUMBER 1, CACO Installation and Hookup of Water Well At Swindlehurst residence, provide an operating water well for potable purposes. Well water to be used for domestic use. Provide placing, drilling, all fittings, switchover from existing water line and testing. Include drain valve in supply line for winterization. Eliminate shared usage of existing well. The Contractor shall provide all labor, materials, tools, and equipment required to complete this work. All ancillary work, cutting and /or removal of existing work necessary for the installation of new work shall be done as required as part of this contract. The contractor shall minimize disturbance to the site to the greatest extent possible unless directed otherwise. All work performed under this contract shall be done in accordance with applicable local, State, and Federal codes, bylaws and ordinances in effect at the time of this work. |
||||||||||||
Details |
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |