1130 North Drainage Improvements - City of Saint George
Infrastructure
Conception
$1,400,000 CJ est. value
St George, UT 84770

Bloomington Pickleball Courts - City of Saint George
Infrastructure
Conception
$1,174,041 CJ est. value
St George, UT 84790

The Cove at Desert Color
New Construction, Infrastructure - 29,271 SF
Design
$6,800,000 CJ est. value
St George, UT 84790

RFP Construction Manager - New Washington County Purgatory Medical Unit, Housing Expansion, With Booking/Release Remodel
Addition, Demolition, New Construction, Build-out, Infrastructure
Bidding
$14,500,000 CJ est. value
Hurricane, UT 84737

Ash Creek Pipeline Project - Phase 1
Infrastructure
Bidding
$200,000 CJ est. value
St George, UT 84770

Remodel of the Structure at 680 Zion Park Boulevard
Post-Bid
Springdale, UT 84767

Sky Mountain Power Substation Grading and Utilities
Infrastructure
Post-Bid
Hurricane, UT

Bookcliffs Pond Maintenance and Excavating
Infrastructure
Results

SGES Bore Project - Riverside Drive
Infrastructure
Results
Saint George, UT 84790

Black Desert Resort
New Construction
Construction
Ivins, UT

City Creek Pump Station and Pipeline
Construction
Saint George, UT

Bench Lake Townhomes
New Construction, Infrastructure
Pending Verification
$65,000,000 CJ est. value
Hurricane, UT 84737

Zion Regional Medical Center
New Construction, Infrastructure - 85,000 SF
Pending Verification
$50,000,000 CJ est. value
St George, UT 84790

Riverside Drive Sewer Main Replacement R 11 Reach 1 - 62-6200-7970 - City of Saint George
Infrastructure
Conception
$3,500,000 CJ est. value
St George, UT 84790

Onset Financial Core & Shell Bid Package #4
New Construction, Infrastructure - 58,000 SF
Post-Bid
$12,000,000 CJ est. value
St George, UT 84770

Last Updated 08/11/2022 07:04 PM
Project Title

Springdale Wastewater Lagoon Improvements Sand Filtration

Physical Address View project details and contacts
City, State (County) Springdale, UT 84767   (Washington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Springdale (Owner) is seeking proposals from suppliers/manufacturers, with firm prices, of equipment for the treatment of the effluent wastewater from the lagoons to lower the TSS and phosphorus to appropriate levels (see treatment goals section). The proposals will only be accepted by suppliers that provide references for 10 operational filter systems less than 1 MGD in capacity located in the United States. Of the filter systems, at least three of the plants shall have been in service at least 5 years. The filter systems will be designed and constructed around the selected filter equipment and a separate bid will be awarded to a General Contractor at a later date for building and assembly of the selected equipment as well as other ancillary equipment and materials necessary for the lagoon improvements project. Selected supplier will work as a sub-contractor for the General Contractor who wins the bid for the filtration system.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents