Category(s) | Education, Heavy and Highway |
Sub-Category(s) | College/University, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Bidding, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $500,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work that will be required includes but is not limited to the following: o Selective demolition all bleachers, walls, general construction, mechanical, plumbing and electrical as indicated. o Demolition of partial slab and trench as shown. New slab/concrete work as indicated and patching as required to prep for new flooring. o Selective demolition of dasher boards, ice rink, ice refrigeration system will be BY OWNER. o New finish vinyl flooring will be installed BY OWNER under separate contract. o Removal of all debris caused by this Contract. o Protection of the public, building, grounds from damage during this contract is the responsibility of the Contractor for this project at all times. o Repair or replace landscaping including trees, shrubs or other planting disturbed during the Work of the contract with new to match existing, unless otherwise noted. Regrade and reseed any grass area damaged as a result of the Work. Repair any walkways or paved areas damaged as a result of the Work. PROJECT SCHEDULE/DURATION: o The construction is planned to start: JUNE 2023 o Construction duration: 30 DAYS LIQUIDATED DAMAGES: Liquidated Damages of FIVE HUNDRED DOLLARS ($500.00) per calendar day shall be assessed if the Contractor fails to achieve Substantial Completion or causes delay to the Substantial Completion of any portion of the work within the Contract Time. : If awarded this contract, the Contractor on this Project shall be required to perform not less than ten percent (10%) of the completed dollar value of the work with its own forces. SET-ASIDE REQUIREMENTS: The "Set-Aside" Requirement for this Project is that (1) not less than thirty percent (30%) of the Total Contract Price be awarded to subcontractors who are certified by the Connecticut Department of Administrative Services as "Small Business Enterprises" ("SBEs") and (2) not less than ten percent (10%) of the Total Contract Price be awarded to subcontractors who are certified by the Connecticut Department of Administrative Services as "Minority Business Enterprises" ("MBEs") (the 10% set aside for MBEs may be included in the 30% set aside for SBEs). If the Contractor is an S/MBE, then any self-performed work may be included in the Set-Aside Requirement. The Contractor is responsible for ensuring that they, and the S/MBEs they have selected, are eligible Connecticut-certified S/MBE contractors. The University of Connecticut is committed to increasing participation and enrollment of Small and Minority Businesses (S/MBE's) on our contracts. It is expected that those contracting with us will give thoughtful consideration to the approach they use in their selection of the eligible Connecticut-certified S/MBE's that they will utilize and maximizing work opportunities for S/MBE's. Q&A (RFI) Due Date and Time 4/17/2023 2:00 PM No phone calls or RFI questions emailed directly to the Procurement Agent will be accepted. The University reserves the right to reject any or all Bids, in whole or in part, to award any item, group of items, or total bid; and to waive any informality or technical defects; if it is deemed to be in the best interest of the University. PROCUREMENT AGENT: GRIFFIN FEHRS, GRIFFIN.FEHRS@UCONN.EDU, 860-486-2618 The Work of Project is defined by the Contract Documents and consists of the following: 1. Selective demolition all bleachers, walls, general construction, mechanical, plumbing and electrical as indicated. 2. Demolition of partial slab and trench as shown. New slab/concrete work as indicated and patching as required to prep for new flooring. 3. Selective demolition of dasher boards, ice rink, ice refrigeration system will be BY OWNER. 4. New finish vinyl flooring will be installed BY OWNER under separate contract. 5. Removal of all debris caused by this Contract. 6. Protection of the public, building, grounds from damage during this contract is the responsibility of the Contractor for this project at all times. 7. Repair or replace landscaping including trees, shrubs or other planting disturbed during the Work of the contract with new to match existing, unless otherwise noted. Regrade and reseed any grass area damaged as a result of the Work. Repair any walkways or paved areas damaged as a result of the Work |
||||||||||||||||||||||||||||||||||||||
Details | 30,460 SF.
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |