Similar Projects
0.5 MG Elevated Water Tank - Rehabilitation - 19-WAT-050 - City of Fergus Falls
Renovation, Infrastructure
Conception
$750,000 CJ est. value
Fergus Falls, MN 56537

Northeast Water Treatment Plant Improvements
New Construction, Renovation, Infrastructure
Bidding
$300,000 CJ est. value
Willmar, MN 56201

Elevated Water Storage Tank Construction
Demolition, New Construction, Infrastructure
Bidding
$400,000 CJ est. value
Rushmore, MN 56168

Regional Drinking Water Project Contract C - Elevated Water Tower
New Construction
Post-Bid
Cloquet, MN 55720

MPCA: Condensate Tank Repair
Renovation
Post-Bid
Hopkins, MN 55343

Northwest Tower Rehabilitation
Renovation
Results
Bloomington, MN

Commerce Court 1.0 MG Spheroid Water Tower Rehabilitation
Results
$1,000,000 est. value
Vadnais Heights, MN

Wheel Loader Broom, Sprayer, and Water Tank System
Term Contract
Post-Bid
Crookston, MN

250,000 Gallon Water Tower Rehabilitation
Results
Moose Lake, MN

2500 Gallon Double Wall Tanks
Infrastructure
Post-Bid
Willmar, MN

Academy Street Tower & Morehouse Park Reservoir Repairs
Results
Owatonna, MN 55060

Domestic Hot Water Storage Tank Replacement at Iowa Hi-Rise
Infrastructure
Post-Bid
Saint Paul, MN 55106

West 10MG Reservoir Rehabilitation
Results
Bloomington, MN 55420

2021 Water Tower Rehabilitation
Infrastructure
Post-Bid
$275,000 est. value
Badger, MN 56714

Water Storage Tank Rehabilitation, 150,000-Gallon Spheroid WT No. 1
Results
Hoyt Lakes, MN

Last Updated 08/08/2022 04:35 PM
Project Title

0.75 MG Ground Level Storage Tank Replacement - 19-WAT-051 - City of Fergus Falls

Physical Address View project details and contacts
City, State (County) Fergus Falls, MN 56537   (Otter Tail County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $1,600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

0.75 MG Ground Level Storage Tank Replacement As of March 18, 2022, this project is currently in the FY 2022-2026 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents