Similar Projects
Greenway Development: Minnesota River Greenway - Fort Snelling Segment - P00127 - Dakota County
Infrastructure
Conception
$7,425,139 CJ est. value
Eagan, MN 55123

Greenway Development: Minnesota River Greenway - Fort Snelling Segment - P00127 - Dakota County
Infrastructure
Conception
$7,425,139 CJ est. value
Eagan, MN 55123

Vermillion Acres Senior Housing
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Hastings, MN 55033

Vermillion Acres Senior Housing
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Hastings, MN 55033

CSAH 46 and CSAH 33 Improvements
Infrastructure
Bidding
$160,000 CJ est. value
Rosemount, MN 55068

CSAH 46 and CSAH 33 Improvements
Infrastructure
Bidding
$160,000 CJ est. value
Rosemount, MN 55068

Hastings HS Tennis Court Replacement
Post-Bid
Hastings, MN 55033

Road Right-of-Way Maintenance Equipment
Infrastructure
Post-Bid

Grading, Bituminous Surfacing, Signing, TMS, and Lighting
Results

Steve Michaud and Rolling Oaks Parks Parking Lot and Trail Improvements
Results
$625,000 est. value
Lakeville, MN 55044

Orchard Place Retail Center
Addition - 24,800 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Apple Valley, MN 55124

Industrial and Distribution Warehouse
New Construction, Infrastructure - 417,600 SF
Construction
$10,000,000 CJ est. value
Rosemount, MN 55068

Gateway Housing
New Construction, Infrastructure - 75,899 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Burnsville, MN

Floor & Decor / Apple Valley
Demolition, New Construction, Infrastructure - 152,916 SF
Pending Verification
$5,000,000 CJ est. value
Apple Valley, MN 55124

"New" County Road 32 (Cliff/117th St) - 32-65 - Dakota County
Infrastructure
Conception
$1,000,000 CJ est. value
Inver Grove Heights, MN 55077

Last Updated 09/07/2022 11:37 AM
Project Title

Applewood Pointe Roadway Improvements

Physical Address View project details and contacts
City, State (County) Apple Valley, MN 55124   (Dakota County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $948,800 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

ADA Curb Ramps, Street/Road Turn Lane Improvements, Construction, Sidewalks/Curbs/Gutters, Street/Road Pavement Marking, Sewer and Water Construction, Street/Road Widening, Traffic Control Signal Systems, Curbs, Paving (Trail Paving), Water Resources Infrastructure, Paving (Highway, Road or Street). Description: SECTION 00 11 13 ADVERTISEMENT FOR BIDS Bids will be received electronically online only by the City of Apple Valley, Minnesota, through , until 10:00 A.M., CDT, Tuesday, June 14, at which time they will be reviewed for the furnishing of all labor, materials, and all else necessary for the following: City Project 2021-118, APPLEWOOD POINTE ROADWAY IMPROVEMENTS 700 SY Remove Bituminous Pavement, 300 LF Remove Concrete Curb and Gutter, 11 EA Storm Sewer Structure, 1,200 LF RCP Storm Sewer, 2,000 TN Select Granular Borrow, 1,600 TN Cl 5 Aggregate Base, 600 TN Bituminous Mixture, 3,200 LF Concrete Curb and Gutter, 7,000 SF Concrete Walk, Driveway, and Median, 1,100 CY Topsoil Borrow/Compos, 4,300 LF Pavement Markings, 73 SF Traffic Signs, 1 AC Turf Restoration, With related items Digital copies of the Contract Documents can be obtained websute. Bidders can download the Contract documents for $20 by searching for the project on website's Project Search page. Instructions for online bidding are attached. Please contact prior to bidding, at (952) 233-1632 for assistance with free membership registration, downloading, and submitting bids. For electronic bids, electronic bid bonds will also be accepted through Surety 2000 using contract #8194839. The bid bonds must be payable to the City of Apple Valley in the amount of five percent (5%) of the amount of bid, to be forfeited as liquidated damages in the event that the bid is accepted and the bidder shall fail to promptly enter into a written contract and furnish the required bond. Direct inquiries to the Project Engineer, Eric Seaburg at (763) 732-8751. No bidder questions will be addressed after 4:00 P.M. on Friday, June 10, 2022. Bid Security in the amount of 5 percent of the amount of the Bid must submitted through Surety 2000 and accompany each Bid in accordance with the Instructions to Bidders. The Owner reserves the right to retain the deposits of the 3 lowest Bidders for a period not to exceed 60 days after the date and time set for the Opening of Bids. No Bids may be withdrawn for a period of 30 days after the date and time set for the Opening of Bids. The Owner reserves the right to reject any and all Bids, to waive irregularities and informalities therein, and further reserves the right to award the Contract to the best interests of the Owner. Pamela J. Gackstetter, City Clerk City of Apple Valley, Minnesota

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents