Similar Projects
8th Street Commercial Buildings
New Construction, Infrastructure
Conception
$5,800,000 CJ est. value
Rogers, AR 72758

8th Street Commercial Buildings
New Construction, Infrastructure
Conception
$5,800,000 CJ est. value
Rogers, AR 72758

Fox Meadow Subdivision
New Construction, Infrastructure - 35,000 SF
Design
$3,900,000 CJ est. value
Siloam Springs, AR 72761

Fox Meadow Subdivision
New Construction, Infrastructure - 35,000 SF
Design
$3,900,000 CJ est. value
Siloam Springs, AR 72761

High Performance Cold Mix
Infrastructure
Post-Bid

Construction of an Adventure Playground at J.B. and Johnelle Hunt Family Ozark Highlands Nature Center
New Construction
Post-Bid
Springdale, AR 72762

South Main Street Improvements
Infrastructure
Results
Bentonville, AR 72712

Administrative Services Building -1000 SW 14th Street
Infrastructure
Results
Bentonville, AR

SW 4th and B Street Townhomes
New Construction, Infrastructure - 10,451 SF
Construction
$2,000,000 CJ est. value
Bentonville, AR 72712

Starbucks / Bentonville
New Construction, Infrastructure - 1,921 SF
Construction
$800,000 CJ est. value
Bentonville, AR 72712

Morning Star Subdivision
New Construction, Infrastructure
Pending Verification
$45,000,000 CJ est. value
Bentonville, AR 72712

Jiffy Trip #721 / Rogers
New Construction, Infrastructure
Pending Verification
$1,430,000 CJ est. value
Rogers, AR 72756

Metro Business and Space Center
New Construction, Infrastructure - 112,258 SF
Design
$12,100,000 CJ est. value
Rogers, AR 72758

Bentonville Public Library Expansion
Addition, Demolition, Renovation, Infrastructure - 59,009 SF
Post-Bid
$12,000,000 CJ est. value
Bentonville, AR 72712

Mckissic Creek Trail Public Improvement Project
Infrastructure
Results
Bentonville, AR

Last Updated 07/10/2023 04:05 PM
Project Title

Phillips Park Renovation - City Of Bentonville

Physical Address View project details and contacts
City, State (County) Bentonville, AR 72712   (Benton County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Swimming Pool(s)
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposal highlights the extensive park expansion to a 50-acre sports complex, reconfiguring the existing design and adding multiple, tournament-quality sports fields for youth and adult recreation. To further complement the additional playfields, the renovation project includes new sports lights, restroom facilities, batting cages, playgrounds, splash park, passive recreation space, greenspace, and parking. As of July 21, 2021, this project is in the conceptual phase. Information regarding design team and contractor selection has not been disclosed. A firm timeline for construction has not been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Special Coatings, Cementitious Coatings.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Selective Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents