Similar Projects
City Hall Replacement Building - PW 17-2 - City of Benson
Demolition, New Construction, Infrastructure
Conception
$3,200,000 CJ est. value
Benson, AZ 85602

Terminal Building - CIP AIR 23-5 - City of Benson
New Construction, Infrastructure
Conception
$700,000 CJ est. value
Benson, AZ 85602

Villages at Vigneto
New Construction, Infrastructure
Design
$4,000,000,000 CJ est. value
Benson, AZ 85602

Villages at Vigneto
New Construction, Infrastructure
Design
$4,000,000,000 CJ est. value
Benson, AZ 85602

Construction of New Facilities Building
New Construction, Infrastructure
Bidding
$450,000 CJ est. value
Bisbee, AZ 85603

Canopy for CTE at Sierra Vista Campus
Infrastructure
Bidding
$540,000 CJ est. value
Sierra Vista, AZ 85635

AZ FLAP SR181(1), Chiricahua Access Road
Post-Bid
$4,000,000 to $6,000,000 est. value
Willcox, AZ 85643

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

System Preservation
Infrastructure
Results
$7,100,000 est. value
Benson, AZ

Sierra Vista Municipal Airport Redevelopment Project
Infrastructure
Results
Sierra Vista, AZ 85613

Whetstone Force Main Pump System - City of Benson
Infrastructure
Pending Verification
$1,520,000 CJ est. value
Benson, AZ 85602

Kansas Settlement Road Convenience Store and Gas Station
New Construction, Infrastructure - 3,750 SF
Pending Verification
$900,000 CJ est. value
Willcox, AZ 85643

Pad A Hangars - CIP AIR 23-4 - City of Benson
New Construction, Infrastructure
Conception
$1,650,000 CJ est. value
Benson, AZ 85602

North Central Avenue Skating Rink
New Construction, Infrastructure - 20,000 SF
Design
$5,300,000 CJ est. value
Sierra Vista, AZ 85635

RFQ Construction Manager at Risk - Aquatic Construction Project
New Construction, Infrastructure
Bidding
$2,226,058 CJ est. value
Willcox, AZ 85643

Last Updated 01/19/2023 06:07 AM
Project Title

Chiricahua Access Road

Physical Address View project details and contacts
City, State (County) Willcox, AZ 85643   (Cochise County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Request for Qualifications, Construction start expected January 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $11,941,016 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As per the Owner the project has been cancelled. Editorial Content Team is actively seeking updated information TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE ACCEPTED AFTER 4 P.M. ON NOVEMBER 10, 2022 Questions can be submitted to CFLContracts@dot.gov. Questions and answers will be posted at https://sam.gov Modifications to Bids - Bids may be modified or withdrawn by regular mail, electronic commerce (email) or facsimile, if such notice is received prior to the time specified for receipt of bids. The Government will not be responsible for ANY failure attributable to the transmission or receipt of electronic commerce (email) or facsimile data. For all modifications, we STRONGLY ENCOURAGE you to resubmit the entire bid schedule with a unit price and amount for every bid item, and a Schedule Total. See FAR Provision 52.214-5, Submission of Bids. Modifications which make the bid ambiguous, indefinite, or uncertain as to any essential requirement of the contract will cause the bid to be rejected as nonresponsive. FAX Number to submit modifications to bids for this project is (720) 963-3360 Email Address to submit modifications to bids for this project is cflcontracts@dot.gov II. POST AWARD INFORMATION CFLHD will no longer be providing paper copies of the conformed contract to the Awarded Prime Contractor. Insurance requirements - See Subsection 107.05 of the FP-14. EEBACS - Contractors shall use the Government's web-based system, Engineer's Estimating, Bidding, Award, and Construction System (EEBACS), to prepare all "Inspector's Daily Record of Construction Operations" (Contractors Daily Reports) and measurement notes (pay notes). The Contractor shall be required to attend a training session on the use of EEBACS. The training session will require up to 4 hours. No more than 3 Contractor staff may attend the training unless approved by the CO. The Contractor shall be responsible for training additional staff. The Contractor shall be required to submit a user account form to gain access to the EEBACS system. See Subsection 108.01. Commencement, Prosecution, and Completion of Work. (APR 1984) Alternate I (APR 1984) The Contractor shall be required to (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than {Refer to Subsection 108.01 of the SCRs}. The time stated for completion shall include final cleanup of the premises. The completion date is based on the assumption that the successful offeror will receive the notice to proceed by January 19, 2023. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer. Schedule at least 2 non-work days out of every 14 calendar days. The selected non-work days do not need to be consecutive, but they must be scheduled. Notify the CO at least 2 weeks before changing the scheduled days off. The CO may grant written approval for exemptions to scheduled days off for specific project operations and for periods of limited duration. Add the following: A Notice to Proceed must be issued before commencement of any work. The contract completion date is May 25, 2023. ESTIMATED PRICE: The price range of the project work is between $5,000,000 and $10,000,000. Site Visit (Construction). (FEB 1995) (a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed. B-11 (b) Site visits may be arranged during normal duty hours by contacting: No organized site visit will be held. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Project No:AZ FLAP SR181(1), 217-419, HFLCEO220388PR

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents