Similar Projects
Treasure Island Elementary School Community Park - Construction - CP23-07 - North Bay Village
New Construction, Infrastructure
Conception
$2,703,546 CJ est. value
North Bay Village, FL 33141

NW North River Drive Multifamily
Demolition, New Construction, Infrastructure - 6,800 SF
Design
$50,000,000 CJ est. value
Miami, FL 33136

NW North River Drive Multifamily
Demolition, New Construction, Infrastructure - 6,800 SF
Design
$50,000,000 CJ est. value
Miami, FL 33136

Publix #1770 - Riviera Plaza / Coral Gables
New Construction, Infrastructure - 52,363 SF
Post-Bid
$10,000,000 CJ est. value
Coral Gables, FL 33146

Publix #1770 - Riviera Plaza / Coral Gables
New Construction, Infrastructure - 52,363 SF
Post-Bid
$10,000,000 CJ est. value
Coral Gables, FL 33146

North Cruise Boulevard Extension Phase III
Results
Less than $11,834,424 est. value
Miami, FL

Design-Build Services for Roadway Improvements to NE 2nd Avenue
Results
Less than $10,307,626 est. value
Miami, FL 33128

Uni Tower Mixed Use / Miami
New Construction, Infrastructure - 38,000 SF
Construction
$43,000,000 CJ est. value
Miami, FL 33132

Farmasi Cosmetics Office and Distribution Facility
New Construction, Infrastructure - 80,000 SF
Construction
$9,000,000 CJ est. value
Doral, FL 33172

Beckham's Miami Freedom Park - United Major League Soccer Stadium
New Construction, Infrastructure - 1,000,000 SF
Pending Verification
$1,000,000,000 CJ est. value
Miami, FL 33125

Beckham's Miami Freedom Park - United Major League Soccer Stadium
New Construction, Infrastructure - 1,000,000 SF
Pending Verification
$1,000,000,000 CJ est. value
Miami, FL 33125

Eleven44
New Construction, Infrastructure - 16,607 SF
Design
$3,600,000 CJ est. value
Miami Beach, FL 33141

Construction Services for a Roadway Improvement
Post-Bid
Miami Shores, FL 33150

Doral Pedestrian Bridge Design Build
Results
Doral, FL

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Last Updated 11/02/2022 02:33 PM
Project Title

RFP Engineering - SR 994/SW200 St/Quail Roost Dr from SW 137 Ave to SW 127 Ave

Physical Address View project details and contacts
City, State (County) Miami, FL 33130   (Miami-Dade County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development
Contracting Method Competitive Bids
Project Status Feasibility Study, Construction start expected June 2027 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $540,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 2, 2022, information regarding the award and award date has not been disclosed. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) District : 06 Professional Liability Insurance : $250,000.00 Selection Method : Letter of Response and Oral Presentation TRC Members (Subject to Change) : Elsa Riverol Misleidys Leon Nicholas Danu The goal of the Department's Under-Utilization strategy is to encourage and promote use of Disadvantaged Business Enterprises (DBE) and Small Businesses in areas of work where they have been under-used. Under-Utilization is defined by FDOT as 25% or less utilization level in a Work Group, which may vary by district. PD&E study and Design of SR-994/ Quail Roost Dr. from SW 137th Ave to SW 127th Ave. If you have previously downloaded the Safety Studies & Scoping Report from FTP that were uploaded on 01/15/2021, please make sure you re-download the UPDATED reports on FTP that were uploaded on 02/08/2021. Financial Management Number(s) 445804-1-22-01 Longlist Date/Time 3/10/2021 12:00 am Shortlist Selection Date/Time 3/15/2021 07:30 pm Phase II Submittal Deadline Date/Time 3/31/2021 12:30 am Final Selection Date/Time 4/19/2021 07:30 pm Negotiations Period Begin Date 4/27/2021 Negotiations Period Ending Date 6/01/2021 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - SR 994/SW200 St/Quail Roost Dr from SW 137 Ave to SW 127 Ave

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents