Similar Projects
Electrical, Framing, Mechanical, Flooring,Plumbing, Drywall
Alteration
Design
San Francisco, CA 94128

Folsom Hydraulic Cylinder Replacement (HCR)
Infrastructure
Bidding
$25,000,000 CJ est. value
Folsom, CA 95630

Gas Detection System Refurbishment
Infrastructure
Bidding
$100,000 CJ est. value
Oceanside, CA 92054

New ES Replacement Campus Increment No. 2
Renovation
Sub-Bidding
$40,000 CJ est. value
Weed, CA 96094

Job Order Contracts - Plumbing Contracting Services
Term Contract
Sub-Bidding
$2,000,000 CJ est. value
Redwood City, CA 94063

Modular Classroom Restroom Addition At Haynes Elementary School
Renovation
Post-Bid
Ontario, CA 91762

Building D 2nd Floor Labs Mechanical System Upgrades
Alteration
Post-Bid
$600,000 est. value
Long Beach, CA 90808

Plumbing Services
Term Contract
Results
$200,000 est. value
San Jose, CA 95128

Plumbing Contractor
Term Contract
Results
Concord, CA

District 22 Trunk Sewers Group 1 Rehabilitation
Infrastructure
Bidding
$4,200,000 CJ est. value
Glendora, CA 91741

Construction Job Order Contracting - General Services Department (Plumbing Construction)
Term Contract
Sub-Bidding
Santa Cruz, CA 95060

Plumbing Services BPA
Term Contract, Alteration
Post-Bid
Edwards, CA

District Wide HVAC Replacements 11 Campuses (COVID) - Plumbing
Alteration
Results
$1,000,000 est. value
Hesperia, CA 92344

Product Water Pump Station Upgrades Project
Renovation
Bidding
$3,200,000 CJ est. value
Santa Barbara, CA 93103

Citywide Plumbing Services
Term Contract
Sub-Bidding
$75,000 CJ est. value
Laguna Beach, CA 92677

Last Updated 11/18/2022 09:08 AM
Project Title

Various Locations Sewer Replacement No. 10

Physical Address View project details and contacts
City, State (County) San Francisco, CA 94103   (San Francisco County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $5,450,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This Project is subject to compliance monitoring and enforcement of prevailing wage requirements by the California Department of Industrial Relations ("DIR") and the San Francisco Office of Labor Standards Enforcement. No contractor or subcontractor may be listed in a bid for a public works project and no contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the DIR per California Labor Code Section 1725.5 [with limited exceptions from this requirement for bid purposes only under California Labor Code Section 1771.1(a)]. The objective of the project is to replace existing sewers at various locations within the City and County of San Francisco. The work is to be performed in San Francisco, California. The contract will be awarded to the responsible Bidder submitting the lowest responsive bid. Bid discounts may be applied as per San Francisco Administrative Code Chapter 14B. The Local Business Enterprise (LBE) subcontracting requirement is 10.00%. The LBE subcontracting requirement can only be met with certified San Francisco Micro and Small-LBEs. The LBE subcontractor participation requirement for this Contract is less than 20% for the following reasons: Due to the large amount of specialized cured-in-place main sewer pipe lining work on this contract. The approximate total main sewer pipe work is 3,917 linear feet of which is approximately 2,128 linear feet of specialized cured-in-place lining of existing 12, 15 and 21-inch diameter main sewers. SFPUC-LBEs cannot be counted towards meeting the LBE subcontracting requirement(s). Prime and Joint Venture level LBE participation cannot be counted towards meeting any of the LBE subcontracting requirement(s). LBE subcontractors must be certified with in the scope of work they are being listed to perform. All Bidders shall submit documented Good Faith efforts with their Bids as directed on Form 2B, except those who exceed the above-stated subcontracting requirement(s) by at least 35%. Refer to Attachment 1. Failure to comply with Chapter 14B requirements may result in a Bid being deemed non-responsive and ineligible for Contract award. Please contact Jason Chow at (415) 554-3103 and Jason.Chow@sfgov.org for further information. Subcontracting opportunities may include, but not limited, to the following major types of work: saw cutting, excavation, traffic control and concrete. In addition, the SFPUC seeks to promote diversity within its contracting opportunities. Thus, the SFPUC strongly encourages bids from Bidders that optimize the use of S.F. Small and Micro-LBE certified subcontracting firms. The SFPUC also seeks to further optimize the use of contractor teams that reflect the diversity of the City and County of San Francisco. As such, the City recommends that Bidders consider the composition of their teams in terms of gender, age, ethnicity, and race, and to utilize teams that include a diverse mix of staff at all organizational levels. SFPUC encourages Bidders to submit a Safety Prequalification Form at least 3-weeks prior to the date of Bid opening. Bidders are required to pass the Safety Prequalification prior to SFPUC considering their bid submission complete. SFPUC will notify Bidders who have passed the Safety Prequalification prior to or on the date of Bid opening. Refer to Section 00 21 13 - Instructions to Bidders, "Bidder Qualifications" and Section 00 45 12 - Safety Prequalification for additional information. A Class "A" California Contractors License is required to bid. Furthermore, each listed subcontractor must possess appropriate active licenses for the work each subcontractor will be performing. This Project is subject to the requirements of the San Francisco Local Hiring Policy for Construction ("Policy") as set forth in Section 6.22(g) and Chapter 82 of the Administrative Code. Bidders are hereby advised that the requirements of the Policy will be incorporated as a material term of any contract awarded for the Project. Refer to Contract Section 00 73 30 for more information. If a Bidder objects on any ground to any bid specification or legal requirement imposed by this Advertisement for Bids, the Bidder shall, no later than the 10th working day prior to the date of Bid opening, provide written notice to the Manager, Contract Administration Bureau, setting forth with specificity the grounds for the objection.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents