Similar Projects
Gibson Pond Dam Replacement
Post-Bid
Lexington, SC

Fy19 Post 45 Clouter Creek South Cell Dike Raise
Results
$10,000,000 to $25,000,000 est. value
Charleston, SC 29403

Town of Pageland Lake Terry Dam Repairs
Results
$40,000 to $45,000 est. value
Jefferson, SC

Twelve Mile Creek WCD Dam 12 (D1940)
Post-Bid
Pickens, SC

Repair of Twelve Mile Creek WCD Dam 12 (D1940)
Results
Less than $23,681 est. value
SC

FY20 Joint Based Charleston Cell Placement Area Dike Construction
Results
$1,000,000 to $5,000,000 est. value
Charleston, SC 29403

Clearwater Lake Dam Repairs
Renovation
Results
$900,000 est. value
Clearwater, SC

FY20 AIWW Placement Area Dike Construction Charleston to Port Royal
Results
$5,000,000 to $10,000,000 est. value

FY20 AIWW Placement Area Dike Construction Charleston to Port Royal
Results
$5,000,000 to $10,000,000 est. value

Stone Lake Dam Outfall Stabilization
Results
Greenville, SC 29602

Emergency Repair - S-315 Gunter Road Pond Dam
Bidding
SC

Reported 06/18/2020 12:00 AM
Project Title

Plum Island Wastewater Treatment Plant Interconnecting Tunnels

Physical Address View project details and contacts
City, State (County) Charleston, SC 29401   (Charleston County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids. Construction Management - CM at Risk.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value $4,000,000 to $6,000,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Work to be performed consists of construction of approximately 500 feet of interconnecting tunnels including installation of 54" pipe between the existing Influent Pump Station (IPS), existing Plant Control Pump Station (PCPS), and existing Harbor Tunnel Pump Station (HTPS); abandonment of the existing Plum Island #1 and #2 Shafts, and a portion of the old Harbor, West Ashley, and vestibule tunnels beneath the Plum Island WWTP footprint; modifications to the PCPS; and partial abandonment/demolition of the existing HTPS to include removal of mechanical and electrical equipment.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents