Similar Projects
UCSF Helen Diller Medical Center at Parnassus Heights
New Construction - 955,000 SF
Design
$10,000,000 CJ est. value
San Francisco, CA 94143

Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for Renovation, Repair, and New Construction, of Medical Facility Construction at Various Government Installations
New Construction, Renovation
Design
$15,000,000 to $1,000,000,000 est. value

ZSFG Building 5 Seismic Upgrade and Renovation CM/GC Contract
Renovation
Bidding
San Francisco, CA 94103

RFP D/B - San Francisco Municipal Transportation Agency (SFTMA) Potrero Yard Modernization Project
New Construction, Renovation, Infrastructure
Post-Bid
$311,500,000 CJ est. value
San Francisco, CA 94110

Master As-Needed Agreement M14 Curb Ramp Construction
Infrastructure
Post-Bid
$1,000,000 est. value
San Francisco, CA

Richmond Residential Streets Pavement Renovation and Sewer Replacement
Infrastructure
Results
$7,300,000 est. value
San Francisco, CA

PW Transit As-Needed Contract No. 2
Infrastructure, Alteration
Results
$3,000,000 est. value
San Francisco, CA

Howard Street Mixed-Use
New Construction, Infrastructure - 117,400 SF
Construction
$20,000,000 CJ est. value
San Francisco, CA 94103

Porsche TI / San Francisco
Renovation, Infrastructure - 70,902 SF
Construction
$2,000,000 CJ est. value
San Francisco, CA 94103

Carmel Townhomes
New Construction, Infrastructure - 23,285 SF
Pending Verification
$6,400,000 CJ est. value
Walnut Creek, CA 94596

Carmel Townhomes
New Construction, Infrastructure - 23,285 SF
Pending Verification
$6,400,000 CJ est. value
Walnut Creek, CA 94596

Helen Diller Medical Center at Parnassus Height
New Construction
Design
San Francisco, CA 94143

Building 8 Seismic Retrofit
Renovation
Post-Bid
San Francisco, CA 94121

SF State Science Replacement Building - Earthwork
Infrastructure
Results
San Francisco, CA

California Campus - San Francisco University High School
Demolition, New Construction, Infrastructure - 47,000 SF
Pending Verification
$88,000,000 CJ est. value
San Francisco, CA 94115

Last Updated 10/03/2022 08:39 AM
Project Title

Laguna Honda Hospital and Rehabilitation Center Administration Building M and O Wings Renovation

Physical Address View project details and contacts
City, State (County) San Francisco, CA 94116   (San Francisco County)
Category(s) Heavy and Highway, Medical
Sub-Category(s) Hospital, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $52,064,300 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Laguna Honda Hospital and Rehabilitation Center Administration Building M & O Wings Renovation is an 86,461 SF adaptive reuse project that intends to convert two former hospital wards, the M and O wards and the spine that connects them between, into office space to support 420 full-time equivalent employees for the San Francisco Department of Public Health. The project occurs in the vacated portion of the former hospital building, which was decommissioned from the Office of Statewide Health Planning and Development/Department of Health Care Access and Information (OSPHD/HCAI) after the replacement hospital opened, and is currently under the jurisdiction of the San Francisco Department of Building Inspection (SFDBI). The project's scope consists of demolition of interior non-structural elements including hazardous materials abatement as required for the new work; new roofing; replacement of exterior windows, storefronts, and doors; exterior concrete and cement plaster crack and spall repairs; new accessibility-compliant parking spaces, passenger loading zone, canopy, and entrance at the east parking lot; a voluntary lateral-force resisting system upgrade; modernization of elevators 12 and 13; and a tenant improvement consisting of new framed walls, doors, door frames, windows, plumbing fixtures, finishes, and mechanical, plumbing, fire protection, electrical, lighting, fire alarm, telecommunications, and security upgrades.For all Covered Projects advertised for bids on or after March 25, 2013, the mandatory participation level in terms of Project Work Hours within each trade to be performed by Local Residents is 30%, with a goal of no less than 15% of Project Work Hours within each trade to be performed by Disadvantaged Workers Bidders mustachieve 80 out of 100 points to be deemed responsive. Bidders willreceive 15 points for attending the pre-bid conference. Refer to CMDForm 2B. For details, contact Selomey Dzikunu by phone at(628) 271-2094 or by email at selormey.dzikunu@sfdpw.org CONTRACT DURATION: 548 consecutive calendar days from NTP to Substantial Completion. ESTIMATE: Approximately $59,386,301 Attendees are required to be fully masked while on the Laguna Honda Hospital campus.In order to attend the site visit, you must register at least one day prior to meeting no later than 1pm, by emailing attendee name, company, email, phone number, proof of vaccination and negative test result if applicable to Young Jae Kim at youngjae.kim@sfdph.org. After registering, you will receive a confirmation email with further instructions and any documents for the site visit.Class "B" license is required to bid. PW-DPH-1903-LHH-K and M WINGS

Details

86,461 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Support Assemblies, Healthcare Metal Supports.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Compartments and Cubicles, Toilet Compartments, Partitions, Service Walls, Patient Bed Service Walls, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Protective Covers.
Division 11 - Equipment, Mercantile and Service Equipment, Vending Equipment, Foodservice Equipment, Ice Machines, Cleaning and Disposal Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Operating Room Equipment, Solid Waste Handling Equipment.
Division 12 - Furnishings, Window Blinds, Casework, Furniture, Seating, Institutional Furniture, Healthcare Furniture.
Division 13 - Special Construction, Radiation Protection.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems, Healthcare Intercommunications and Program Systems, Healthcare Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Radiation Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents