Similar Projects
Last Updated | 10/03/2022 08:39 AM |
Project Title | Laguna Honda Hospital and Rehabilitation Center Administration Building M and O Wings Renovation |
Physical Address | View project details and contacts |
City, State (County) | San Francisco, CA 94116 (San Francisco County) |
Category(s) | Heavy and Highway, Medical |
Sub-Category(s) | Hospital, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $52,064,300 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Laguna Honda Hospital and Rehabilitation Center Administration Building M & O Wings Renovation is an 86,461 SF adaptive reuse project that intends to convert two former hospital wards, the M and O wards and the spine that connects them between, into office space to support 420 full-time equivalent employees for the San Francisco Department of Public Health. The project occurs in the vacated portion of the former hospital building, which was decommissioned from the Office of Statewide Health Planning and Development/Department of Health Care Access and Information (OSPHD/HCAI) after the replacement hospital opened, and is currently under the jurisdiction of the San Francisco Department of Building Inspection (SFDBI). The project's scope consists of demolition of interior non-structural elements including hazardous materials abatement as required for the new work; new roofing; replacement of exterior windows, storefronts, and doors; exterior concrete and cement plaster crack and spall repairs; new accessibility-compliant parking spaces, passenger loading zone, canopy, and entrance at the east parking lot; a voluntary lateral-force resisting system upgrade; modernization of elevators 12 and 13; and a tenant improvement consisting of new framed walls, doors, door frames, windows, plumbing fixtures, finishes, and mechanical, plumbing, fire protection, electrical, lighting, fire alarm, telecommunications, and security upgrades.For all Covered Projects advertised for bids on or after March 25, 2013, the mandatory participation level in terms of Project Work Hours within each trade to be performed by Local Residents is 30%, with a goal of no less than 15% of Project Work Hours within each trade to be performed by Disadvantaged Workers Bidders mustachieve 80 out of 100 points to be deemed responsive. Bidders willreceive 15 points for attending the pre-bid conference. Refer to CMDForm 2B. For details, contact Selomey Dzikunu by phone at(628) 271-2094 or by email at selormey.dzikunu@sfdpw.org CONTRACT DURATION: 548 consecutive calendar days from NTP to Substantial Completion. ESTIMATE: Approximately $59,386,301 Attendees are required to be fully masked while on the Laguna Honda Hospital campus.In order to attend the site visit, you must register at least one day prior to meeting no later than 1pm, by emailing attendee name, company, email, phone number, proof of vaccination and negative test result if applicable to Young Jae Kim at youngjae.kim@sfdph.org. After registering, you will receive a confirmation email with further instructions and any documents for the site visit.Class "B" license is required to bid. PW-DPH-1903-LHH-K and M WINGS |
||||||||||||||||||||||||||||||||||||||||||||||
Details | 86,461 SF.
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |