Similar Projects
Mirror Lake Drive Sidewalk, Drainage & Pavement Improvements
Post-Bid
Less than $1,600,000 est. value
Lake Placid, NY 12946

New City Buildings and Infrastructure Improvements– Sheriff and Correctional Center Parking Lot Modifications
Post-Bid
New City, NY 10956

Rehabilitation/Construction of Canalway Trail - Fort Edward (GFFC) to Kingsbury (New Swamp Road)
Term Contract
Results
Fort Edward, NY

One Lagrange Avenue Parking Lot Renovations
Results
Poughkeepsie, NY

Beacon Main Street Accessibility Improvements/ Beacon Pedestrian Signal Improvements
Term Contract
Post-Bid
Beacon, NY 12508

Mirror Lake Drive Sidewalk, Drainage and Pavement Improvements
Results
Less than $1,100,000 est. value
Lake Placid, NY

Downtown White Plains Transit District Pedestrian and Bicycle Improvement
Term Contract
Post-Bid
White Plains, NY 10601

North Creek Streetscape and Water Infrastructure Project
Results
Lake George, NY 12845

North Middletown Road Pedestrian Link
Post-Bid
Pearl River, NY 10965

LFTC Sidewalk Connection and Complete Streets/Blacksmith Square Drive Sidewalk Project
Term Contract
Results
Ballston Spa, NY 12020

North Tonawanda Downtown Placemaking
Post-Bid
North Tonawanda, NY 14120

CDBG South Troy Neighborhood Reinvestment Project - Sidewalks and Curbs - Phase 1 and 2
Results
Troy, NY

Broome Developmental Center - Concrete Entrance Walkway
Post-Bid
Binghamton, NY 13905

Canalway Trail Lock E-18 To Route 167 On The Erie Canal
Results
Little Falls, NY 13365

Hector Street Complete Street
Term Contract
Post-Bid
Less than $5,000,000 est. value
Ithaca, NY 14850

Reported 04/25/2020 12:00 AM
Project Title

2020 Chips Sidewalks ADA Ramps Repair

Physical Address View project details and contacts
City, State (County) Watertown, NY 13601   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of repairing 42 City Sidewalk ADA ramps throughout the City. The successful bidder will be required to supply all labor, materials and equipment to perform the ADA ramp replacement according to the specified documents, construction locations, and details and as directed by the City Engineer including, but not limited to the following: 1. Removal and disposal of the existing ramps, 4,680 SQFT and unsuitable sub-base material as shown on the Contract Drawings and as directed by the City Engineer. 2. Excavate to new sub-grade, install and compact new sub-base material as shown on the Contract Drawings. 3. Replace the 42 illustrated ramps to meet or exceed PROWAG standards. See Ramp Detail Drawings for all specs. All ramps, and any new sidewalk blocks that extend off the ramp area are to be 5 foot x 5 foot blocks, and are to be a minimum depth of 6 inches thick 4. Remove a 20“ box elder tree from 803 Mill St. At all sites where a tree is removed; the stump shall be grinded out, to a minimum depth of 9 inches. The stump cavity shall be cleared of all woody material, backfilled with soil and seeded. This is to include a minimum of 6 inches of topsoil 5. If there is a Monument in the ramp area, that needs its elevation adjusted, the contractor is responsible for this work. The contractor is to have a licensed surveyor mark out the location before the old bronze is remover. Once the old bronze is removed the contractor is to install a new bronze with the cover and frame at the new elevation. See detail sheet for specifications. 6. Any trees within 25 feet of the work site must be protected as specified by the attached tree protection detail sheet. 7. Site restoration of soft surface and hard surface will be preformed where directed and as shown within the details. 8. Provide traffic control and daily maintenance of adjoining streets and areas. 9. Coordinate with the local utilities companies in conjunction with any relocation of existing facilities.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents