Similar Projects
Annual Chemical Supply Water Wastewater Treatment
Term Contract
Sub-Bidding
Aztec, NM 87410

Purchase of One (1) Single Radius Arch Culvert
Term Contract
Sub-Bidding
Aztec, NM 87410

Request for Qualifications for Professional Services
Term Contract
Post-Bid

Latrine and Hand Washing Stations W/Cleaning Services
Term Contract
Post-Bid
Albuquerque, Los Alamos, Rio Rancho, Santa Fe, NM 87120

Warehouse
Term Contract
Post-Bid
Farmington, NM 87401

Animas Substation Direct Current (DC) Panels
Term Contract
Post-Bid
Farmington, NM 87401

Transformer and Switch for Animas Substation
Term Contract
Post-Bid
Farmington, NM 87401

Three (3) Phase Electronic Reclosers for Stock Rebid
Term Contract
Post-Bid
Farmington, NM 87401

Procurement of Gravel Materials for the Block 7 Drainage Project Phase III
Term Contract
Post-Bid
Farmington, NM 87401

Furnish and Install Fiber Optic Cable and Materials
Term Contract
Post-Bid
Farmington, NM 87401

Newcomb Substation Project - Five (5) 24.94kv Substation Reclosers
Term Contract
Post-Bid
$350,000 CJ est. value
Newcomb, NM 87455

Newcomb Substation Project - Equipment (Control Building)
Term Contract
Post-Bid
Newcomb, NM 87455

Three (3) Phase Padmount Transformers for Stock
Term Contract
Post-Bid
Farmington, NM 87401

Animas / Bergin Substation Junction Boxes
Term Contract
Post-Bid
Farmington, NM 87401

Aviation 100 Octane Low Lead Self-Service Fueling Facility and Support Services
Term Contract
Post-Bid
Farmington, NM 87401

Last Updated 04/25/2023 04:09 PM
Project Title

Water Utility Block to Block Construction

Physical Address View project details and contacts
City, State (County) Farmington, NM 87401   (San Juan County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Farmington is seeking bidders to perform work under this contract that shall consist of furnishing all labor, equipment, and materials for emergency/on-call construction services as well as capital construction projects with specific needs on an “as needed basis” requiring installation, rehabilitation, repair, and/or replacement of City-owned water distribution infrastructure in accordance with the Standard Specifications such as small and large diameter municipal water distribution and transmission lines, temporary and permanent water service connections, valves, valve vaults, and other related work. 4/17/2023 04:00:00 PM (MT) Deadline for Questions 5/9/2023 06:00:00 PM (MT) Tentative Council Approval

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents