Similar Projects
Clayton Lodge Kitchen Expansion
Addition, Demolition, Infrastructure
Design
$500,000 CJ est. value
Maryville, TN 37804

Photovoltaic Array
Infrastructure
Design
$10,000,000 CJ est. value
Louisville, TN 37777

Construct Ground Base PV Array
New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
Louisville, TN 37777

RFP - 246 North Rankin Road Development
New Construction, Infrastructure
Bidding
$235,798 CJ est. value
Alcoa, TN 37701

Great Smoky Mountains - Road Repair and Site Work
Infrastructure
Post-Bid
$2,000,000 to $10,000,000 est. value
Tallassee, TN

Taco Bell
Renovation - 2,385 SF
Post-Bid
Alcoa, TN 37701

North End Booster Pump Stations
New Construction, Infrastructure
Results
$1,027,963 CJ est. value
Lenoir City, TN 37772

Resurfacing on S.R. 162
Infrastructure
Results
$2,611,809 CJ est. value
West Millers Cove, TN 37886

Yassin Falafel Waffle House
New Construction
Pending Verification
Maryville, TN

Frogpond Road Subdivision
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Friendsville, TN 37737

Northfield Drive Stormwater Pipe Replacement Project
Infrastructure
Post-Bid
$295,000 CJ est. value
Maryville, TN 37804

Stone Creek Office and Warehouse
New Construction, Infrastructure - 17,099 SF
Pending Verification
$2,000,000 CJ est. value
Maryville, TN 37803

Marconi & Asia Cafe Mixed Use Development
New Construction - 2,200 SF
Post-Bid
$500,000 to $1,000,000 CJ est. value
Alcoa, TN 37701

Pellissippi Place Mixed-Use
New Construction, Infrastructure
Pending Verification
$80,000,000 CJ est. value
Alcoa, TN 37804

Scooter's Coffee
New Construction - 677 SF
Post-Bid
Less than $500,000 CJ est. value
Maryville, TN 37801

Last Updated 06/27/2023 10:07 AM
Project Title

Kickback Jack's Restaurant

Physical Address View project details and contacts
City, State (County) Alcoa, TN 37701   (Blount County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Site Development
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 27, 2023, this project is seeking approvals from the Alcoa Plan Commission. Although there is not a firm timeline, construction could begin in fourth quarter 2023.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents