Similar Projects
Hurricane Laura Damages Restoration to CPSB Administration Building
Renovation
Post-Bid
Lake Charles, LA 70615

Hurricane Repairs Vinton Middle School
Renovation
Post-Bid
Vinton, LA

Sulphur 9th Grade School
Renovation
Results
Calcasieu, Sulphur, LA 70663

Hurricane Repairs for Calcasieu Parish School Board
Renovation
Results
Lake Charles, LA

Hurricane Laura Repairs - A.M. Barbe/SJ Welsh - Sports Fields and Building Repairs
Renovation
Post-Bid
Lake Charles, LA

WHS Modular Football Facility Setup
New Construction
Results
Westlake, LA 70669

St. Louis Catholic High School-Buildings Stabilization
New Construction
Post-Bid
Lake Charles, LA

Dequincy Area Schools Hurricane Restoration
Renovation
Results
DeQuincy, LA 70633

Phase 33 - Improvements Classroom Addition to Existing Pod
Addition
Post-Bid
Lake Charles, LA

Washington Marion High Two-Story Classroom Repairs and Exterior Repairs
Renovation
Results
$887,657 est. value
Lake Charles, LA 70615

Saint Louis Catholic High School Temporary Tension Fabric Structure - Part A
New Construction
Post-Bid
Lake Charles, LA

Starks School Repairs - Hurricane Laura Damages Restoration Project
Renovation
Results
Lake Charles, Starks, LA 70661

Saint Louis Catholic High School Temporary Tension Fabric Structure - Part B
New Construction
Post-Bid
Lake Charles, LA

Additions to Westlake High School
Addition
Results
Lake Charles, Westlake, LA 70669

Hackberry High School Restoration Phase II
New Construction
Post-Bid
$400,000 est. value
Lake Charles, LA 70607

Last Updated 06/09/2022 03:01 AM
Project Title

Washington Marion High School Athletic Facility Repairs

Physical Address View project details and contacts
City, State (County) Lake Charles, LA 70615   (Calcasieu County)
Category(s) Education, Entertainment/Recreation
Sub-Category(s) Athletic Facility, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $508,993 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Athletic Facility, Renovation.
Division 01 - General Requirements, Construction Facilities.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents