Similar Projects
WY Nps 2017(1) Moose Wilson Road Phase 1
Term Contract
Design
Jackson, Teton Village, WY 83001

Burgess Road (Nfsr #15) Road Improvements
Term Contract
Design
Sheridan, WY 82801

Road Rehabilitation
Infrastructure
Bidding
Lusk, WY

USFS Cold Springs Road Improvement, Hyatteville, Wy
Term Contract
Bidding
$100,000 to $250,000 est. value
Buffalo, Sheridan, WY 82834

WY Flap 407(1) Kortes Road
Term Contract
Post-Bid
Alcova, WY

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

The Construction of 2021 Fall Street Patching Project
Infrastructure
Results
Jackson, WY 83002

Bar Nunn Asphalt Improvements - Phase II
Alteration
Results
$293,832 est. value
Bar Nunn, WY

Crazy Woman Road Improvement Project
Term Contract
Design
$500,000 to $1,000,000 est. value
Buffalo, WY

WY Flap 704(1) Skyline Drive & Fremont Lake Road
Term Contract
Bidding
Pinedale, WY 82941

WY NPS Yell 10(23), Grand Loop Road - Old Faithful To West Thumb
Term Contract
Post-Bid
Yellowstone National Park, WY

Casper - Kaycee (Horse Ranch Creek South)
Infrastructure
Results
Casper, Kaycee, WY

Cold Springs Road Improvement Project
Term Contract
Bidding
$100,000 to $250,000 est. value
Hyattville, WY 82428

Milling Plant Mix, Bituminous Pavement Surfacing and Miscellaneous
Infrastructure
Post-Bid

District 3 Bridge Rehabilitation
Infrastructure
Results
WY

Reported 01/14/2022 12:00 AM
Project Title

Milling Plant Mix, Bituminous Pavement Surfacing, Chip Seal and Miscellaneous Work

Physical Address View project details and contacts
City, State (County) WY   (Carbon County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Milling plant mix, bituminous pavement surfacing, chip seal and miscellaneous work on approximately 2.90 miles on WYO 72 beginning at RM 0.00 between Hanna and Elk Mountain in Carbon County. Stp-0412008: 5 - Roadway Description: # Item Description Quantity Unit 1 106.05110 Field Laboratory 1.000 Ls 2 106.05200 Contractor Testing 1.000 Ls 3 109.04000 Force Account Work 20,000.000 $$ 4 109.08000 Mobilization 1.000 Ls 5 202.03305 Milling Plant Mix 65,000.000 Sy 6 202.03430 Removal Of Sidewalk 33.000 Sy 7 202.03445 Removal Of Curb And Gutter 16.000 Ft 8 202.03610 Cutting Concrete 110.000 Ft 9 209.01000 Water 60.000 Mg 10 210.03300 Motor Grader 50.000 Hr 11 215.01000 Contractor Storm Water Control 1.000 Ls 12 301.01085 Crushed Base 7.000 Cy 13 401.02000 Hot Plant Mix 6,710.000 Ton 14 401.02040 Test Strip 1.000 Ea 15 401.02055 Hot Plant Mix Approaches 1,225.000 Ton 16 401.03326 Asphalt Binder (Pg 64-34) 425.000 Ton 17 407.01000 Tack Coat 13.000 Ton 18 409.03075 Chip Seal (Overshoot) 48,200.000 Sy 19 409.03085 Emulsified Asphalt Modified 85.000 Ton 20 409.03090 Emulsified Asphalt Overshoot 12.000 Ton 21 413.01000 Hydrated Lime 77.000 Ton 22 499.03046 Reclaimed Asphalt Pavement Widening 140.000 Cy 23 608.10200 Sidewalk (Conc) 33.000 Sy 24 609.10200 Curb And Gutter Type a 16.000 Ft 25 702.51010 Flexible Delineators, Type Ii 16.000 Ea 26 702.51020 Flexible Delineators, Type Iii 85.000 Ea 27 702.51030 Flexible Delineators, Type Iv 4.000 Ea 28 703.03100 Flagging 1,100.000 Hr 29 703.03110 Temporary Traffic Control 1.000 Ls

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents