Similar Projects
Sandoval Regional Medical Center - Center for Excellence in Orthopedic Surgery and Rehabilitation Project
Post-Bid
Albuquerque, NM

Covenant Health Hobbs Hospital
New Construction - 108,500 SF
Construction
Hobbs, NM 88240

CT Scanner Room Renovation
Renovation - 1,086 SF
Post-Bid
Rio Rancho, NM 87144

Presbyterian Healthcare Services - Support and Patient Rooms
New Construction, Addition - 454,000 SF
Design
$10,000,000 CJ est. value
Albuquerque, NM 87106

New Hospital Tower Bid Package 3 - Phase III
New Construction
Post-Bid
Albuquerque, NM

UNMH Main Hospital 5ACC Renovations
Renovation
Post-Bid
Albuquerque, NM 87106

UNM SRMC 1st Floor Emergency Department Renovations
Post-Bid
Albuquerque, NM 87144

Construction Manager for Phase III Hospital
Post-Bid
Albuquerque, NM

Renovation of Pharmacy Hazardous Drug Prep & IV Clean Rooms - Building 2000
New Construction, Renovation, Demolition
Post-Bid
$250,000 to $500,000 est. value
Gallup, NM

Construction Services for the Care Detox Addition and Renovation
Renovation, Addition - 13,200 SF
Construction
$3,529,433 est. value
Albuquerque, NM 87108

Phase II Demo, Turnkey Drilled Piers
Post-Bid
Albuquerque, NM 87106

Last Updated 06/16/2021 03:34 PM
Project Title

San Juan Regional Medical Center - 5th Floor Women`s Inpatient Services Update

Physical Address View project details and contacts
City, State (County) Aztec, Farmington, NM 87401   (San Juan County)
Category(s) Medical
Sub-Category(s) Hospital
Contracting Method Competitive Bids.
Project Status Results, All Bids Rejected
Bids Due View project details and contacts
Estimated Value Less than $1,692,675
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovations and improvements to portions of the 5th Floor Inpatient Women’s Services area to include LDRP rooms, Staff Core Areas, Nurse Stations, portions of the Nursery, and the Elevator Lobby. Demolition of existing partitions, floor covering, ceilings, miscellaneous finishes, and portions of existing mechanical, plumbing, and electrical systems. New partitions, floor covering, ceiling systems; installation of interior architectural woodwork, wood doors, hollow metal door frames, toilet and miscellaneous accessories; painting and repainting; and renovation of, and additions to, existing mechanical and electrical systems. This work will require the installation of a temporary exterior materials lift at one of two existing concrete lift pads. Construction traffic from the temporary lift may need to cross a corridor used by patient traffic at certain peak times during the day. The Contractor will be required to coordinate construction traffic with the Owner during these peak times, as well as maintain the cleanliness of the patient corridor per ICRA requirements. 2. Replacement of rooftop equipment as part of Alternate 1.

Details

1 Hospital, 5 Stories Above Grade, 16,236 SF Renovation, 2 Building.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Thermal Insulation.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Painting.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents