Similar Projects
Last Updated | 01/19/2023 07:04 AM |
Project Title | Baldwin - Cumberland, St. Croix / Polk County |
Physical Address | View project details and contacts |
City, State (County) | Clayton, WI 54004 (Polk County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $5,711,747 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Baldwin - Cumberland, St. Croix / Polk County Line to CTH J; Clear Lake - Cumberland, 60th Avenue Intersection; Baldwin - Clear Lake, Pedestrian Trail, C-48-0025; Polk County; 1550-02-76, WISC 2022 518; 1550-04-76, WISC 2022 519; 1550-06-75, WISC 2022 520; USH 63; 8.467 Miles; Excavation, Base, HMA Pavement, Asphaltic Surface, Curb and Gutter, Sidewalk, Beam Guard, Box Culvert, Culvert Pipes, and Street Lighting. Estimate Range - $4,000,000 - $4,999,999 $0 - $99,999 $500,000 - $749,999 Unless otherwise specified in this advertisement, the Department will issue bidding proposals only to those who have established their qualifications for the work to be bid upon. Any prospective bidder who has not established their qualifications must file a sworn statement with the Department not less than TEN business days prior to the time set for submitting bidding proposals on a form furnished by the Department. The Department will evaluate this statement and will issue bidding proposals as it deems warranted. To request an exception to this requirement, contact the Chief Proposal Management Engineer at (608) 266-3721 With each sealed proposal, the bidder must include a properly executed bid bond or a cashiers check, certified check, bank check, or postal money order in the amount designated on the Highway Work Proposal made payable to the Department. Certified checks shall be drawn on the account of the bidder submitting the proposal. The bidder may also satisfy the proposal guaranty requirements by having a properly executed annual bid bond on file with the Department. WisDOT - 32 - Baldwin - Cumberland, St. Croix / Polk County *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Proposal ID: 20230110032 Project(s): 1550-02-76, 1550-04-76, 1550-06-75 Federal ID(s): WISC 2022519, WISC 2022520, WISC 2022518 Interim Completion and Liquidated Damages - Pedestrian Underpass C-48-0025: 45 Working Days |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |