Similar Projects
Clear Lake - Cumberland - Construction /Safety/Realignment
Infrastructure
Design
$250,000 CJ est. value
Clear Lake, WI 54005

Clear Lake - Cumberland - Construction /Safety/Realignment
Infrastructure
Design
$250,000 CJ est. value
Clear Lake, WI 54005

CTH M - CTH Pp; Wapogasset Branch Bridge B-48-0057, CTH K
Demolition, New Construction, Infrastructure
Bidding
$750,000 CJ est. value
Deronda, WI 54001

CTH M - CTH Pp; Wapogasset Branch Bridge B-48-0057, CTH K
Demolition, New Construction, Infrastructure
Bidding
$750,000 CJ est. value
Deronda, WI 54001

Hatfield Lake Aeration Design Services
Infrastructure
Post-Bid
New Richmond, WI

Blacktop
Infrastructure
Post-Bid
Clear Lake, WI 54005

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Resurface 1 Mile of 190th Street from 190th Avenue to 180th Avenue
Infrastructure
Results
WI 54024

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

New Richmond - USH 8; North Jct Jewell Street to USH 8, STH 065
Infrastructure
Bidding
$10,000,000 CJ est. value
Osceola, WI 54020

Paving of 75th Street
Infrastructure
Post-Bid
$700,000 est. value
Amery, WI 54001

LRIP 15th Street
Infrastructure
Results
Clayton, WI

Tree Clearing and Surface Patching - Sawmill Rail Trail
Infrastructure
Construction
$52,500 CJ est. value
Balsam Lake, WI 54810

2022 Luck Street Construction - Pulverizing and Paving
Infrastructure
Post-Bid
$200,000 est. value
Luck, WI 54853

Last Updated 01/19/2023 07:04 AM
Project Title

Baldwin - Cumberland, St. Croix / Polk County

Physical Address View project details and contacts
City, State (County) Clayton, WI 54004   (Polk County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $5,711,747 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Baldwin - Cumberland, St. Croix / Polk County Line to CTH J; Clear Lake - Cumberland, 60th Avenue Intersection; Baldwin - Clear Lake, Pedestrian Trail, C-48-0025; Polk County; 1550-02-76, WISC 2022 518; 1550-04-76, WISC 2022 519; 1550-06-75, WISC 2022 520; USH 63; 8.467 Miles; Excavation, Base, HMA Pavement, Asphaltic Surface, Curb and Gutter, Sidewalk, Beam Guard, Box Culvert, Culvert Pipes, and Street Lighting. Estimate Range - $4,000,000 - $4,999,999 $0 - $99,999 $500,000 - $749,999 Unless otherwise specified in this advertisement, the Department will issue bidding proposals only to those who have established their qualifications for the work to be bid upon. Any prospective bidder who has not established their qualifications must file a sworn statement with the Department not less than TEN business days prior to the time set for submitting bidding proposals on a form furnished by the Department. The Department will evaluate this statement and will issue bidding proposals as it deems warranted. To request an exception to this requirement, contact the Chief Proposal Management Engineer at (608) 266-3721 With each sealed proposal, the bidder must include a properly executed bid bond or a cashiers check, certified check, bank check, or postal money order in the amount designated on the Highway Work Proposal made payable to the Department. Certified checks shall be drawn on the account of the bidder submitting the proposal. The bidder may also satisfy the proposal guaranty requirements by having a properly executed annual bid bond on file with the Department. WisDOT - 32 - Baldwin - Cumberland, St. Croix / Polk County *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Proposal ID: 20230110032 Project(s): 1550-02-76, 1550-04-76, 1550-06-75 Federal ID(s): WISC 2022519, WISC 2022520, WISC 2022518 Interim Completion and Liquidated Damages - Pedestrian Underpass C-48-0025: 45 Working Days

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents