Similar Projects
Last Updated | 08/19/2022 02:05 AM |
Project Title | Jefferson Tower 2nd Floor EVS Fit-Out |
Physical Address | View project details and contacts |
City, State (County) | Birmingham, AL 35233 (Jefferson County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | College/University, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $600,000 [brand] Estimate |
Plans Available from | Copy Center - 08/12/22 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of the fit-out of approximately 2,600 SF of existing shell space on the 2nd floor of the UAB Jefferson Tower facility for a new simulation space for the EVS group. The scope of work includes architectural, electrical, and mechanical new work. The construction budget is anticipated to be between $500,000 and $600,000. The work will be performed under a single Prime General Contractor who will coordinate the work of this project. Particular and specific care will be required to limit disturbances, coordinate shutdowns, and follow strict Infection Controls and Interim Life Safety Measures (ICRA/ILSM) requirements for the protection of patients, family and staff. The Prime General Contractors seeking to be pre-qualified will require experience with similar size and type healthcare projects performed in and adjacent to an operating hospital environment and with the implementation and maintenance of infection control measures, interim life safety measures, coordinating shutdowns, and maintaining a clean and organized job site in an operating hospital. The General Contractor must have experience with representative projects as a General Contractor (not as a Construction Manager, Program Manager, etc.) Prime General Contractor bidders interested in submitting a proposal must apply for pre-qualification and must be licensed under the Provision of Title 34, Chapter 8, and Code of Alabama, 1975. A copy of current Alabama Contractors license is to be included in pre-qualification submittal. Only bidders who have completed the pre-qualification process and that have been approved will be eligible to submit a bid for the Project. Any addenda to the prequalification requirements will be issued to documented prime contractors only. The pre-qualification procedure is intended to identify responsible and competent prime contractor bidders relative to the requirements of the Project. Each prospective prime contractor bidder will be notified of the results of the pre-qualification, on or about August 12, 2022. The Owner reserves the right to waive technical errors in applications, extend or abandon the pre-qualification process, should the interests of the Owner appear to be promoted thereby. Bonds: A certified check or bid bond payable to the University of Alabama at Birmingham in an amount not less than five percent (5%) of the amount of the bid, but in no event more than $10,000 must accompany the bidder's proposal. Performance and Statutory Labor and Material Payment Bonds will be required at the signing of the Contract. Bids: Bids must be submitted on proposal forms or copies thereof furnished by the Architect. No bid may be withdrawn after the scheduled closing time for receipt of bids for a period of ninety (90) days. The Owner reserves the right to reject bids if such action is determined to be in the best interest of the Owner. The Owner reserves the right to revoke pre-qualification of any bidder in accordance with Section 39-2-12, Code of Alabama, 1975, as amended in 1997 (by Act 97-225). Bids shall be clearly identified on the exterior of the package with the bidders name, address, State license number, the name of the project being bid, time and place of the bid opening. Sealed bids shall be properly identified. Nonresident Prime Contractor Bidders: Under Section 39-3-5, Code of Alabama, 1975, nonresident prime contractor bidders must accompany any written bid documents with a written opinion of an attorney licensed to practice law in such nonresident prime contractor bidder's state of domicile as to the preferences, if any or none, granted by the law of the state to its own business entities whose principal place of business are in that state in the letting of any or all public contracts. Resident prime contractors in Alabama, as defined in Section 39-2-12, are granted preference over nonresident prime contractors in awarding of contracts in the same manner and to the same extent as provided by the laws of the state of domicile of the nonresident. Fire Alarm Work: In accordance with Title 34, Chapter 33A (the ACT), of the Code of Alabama 1975, bidders for fire alarm work of this project, if any, must include with their bid evidence of licensure as required by the ACT by including with the bid submittal a valid State Fire Marshal's permit. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||||||||||||||||||||
Details | 1 Story Above Grade, 2,600 SF.
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |