Last Updated | 02/10/2022 12:25 PM |
Project Title | Fiscal Year 21/22 Annual Road Paving Project |
Physical Address | View project details and contacts |
City, State (County) | Arcadia, FL 34266 (DeSoto County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $649,792 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Site 1: SE Whispering Pine Drive: Approx. Paving Length: 0.52 miles. Limits: Hargrave Street to Hargrave Street. Work includes asphalt paving of 2.5-inches Type S-3 (average), milling for connections, driveway aprons, sod installation as needed and agreed upon by DeSoto County, and embankment for drop-off correction as needed and agreed upon by DeSoto County. Site 2: NE Sugar Babe Road: Approx. Paving Length: 0.60 miles. Limits: NW County Road to End of Maintenance. This road is broken into 3 separate sections as identified in the Plan Set. Work includes asphalt paving of 1.5-inches Type S-3 (average) in Section 1, 2.5-inches (average) in Section 2 and 3-inches (average) in Section 3. The work also includes milling for connections, driveway aprons, sod installation as needed and agreed upon by DeSoto County, embankment for drop-off correction as needed and agreed upon by DeSoto County, and painted stop bar Site 3: SW Wallis Avenue and SW Clover Drive: Approx. Paving Length: 0.31 miles total (0.19 miles on Wallis and 0.12 miles on Clover). Limits: SW Skates Street to end of maintenance for Wallis. Wallis to end of maintenance for Clover. Work includes asphalt paving of 2.5-inches Type S-3 (average), milling for connections, driveway aprons, sod installation as needed and agreed upon by DeSoto County, embankment for drop-off correction as needed and agreed upon by DeSoto County and painted stop bars. Site 4: SE Pointer Avenue and SE Quail Avenue: Approx. Paving Length: 0.84 miles total (0.50 miles on Pointer and 0.34 miles on Quail). Limits: SE Durrance Street to end of maintenance for Pointer. Pointer to end of maintenance for Quail. Work includes asphalt paving of 3.0-inches Type S-3 (average), milling for connections, driveway aprons, sod installation, embankment for drop-off and painted stop bars. Site 5: NE Peterson Avenue: Approx. Paving Length: 0.38 miles. Limits: NE McIntyre Street to End of Maintenance at NE Corral Drive. Work includes asphalt paving of 2.5-inches Type S-3 (average), milling for connections, driveway aprons, sod installation as needed and agreed upon by DeSoto County, embankment for drop-off correction as needed and agreed upon by DeSoto County and painted stop bar. Engineer’s Estimate: $649,792.03 County Budget: $650,000.00 |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |