Similar Projects
Upper Pinal Creek Bridge and Roadway Alternatives
Renovation, Infrastructure
Bidding
Globe, AZ 85501

System Preservation (Minor Bridge Rehabilitation)
Renovation, Infrastructure
Bidding
$450,000 est. value
AZ

Reconstruction of Court House Pedestrian Bridge
Post-Bid
Bisbee, AZ

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Baker Canyon Low-Water Crossing
Results
Safford, AZ

Bridge Deck Replacement
Results
Less than $1,900,000 est. value
Tuba City, AZ

Val Vista Drive Eastern Canal Bridge Repair
Renovation
Post-Bid
$1,695,000 est. value
Gilbert, AZ 85234

Bridge Replacement
Results
Less than $98,000,000 est. value
AZ

Z--MATOC - IMR Bridges
New Construction
Post-Bid
$10,000,000 est. value

Construct Bridge Rehabilitation
Results
Less than $2,500,000 est. value
AZ

Bridge Deck Replacement
Results
Less than $2,200,000 est. value
Nogales, AZ 85600

Tyson Wash Bridge
Results
$9,374,165 est. value
Parker, AZ

Bridge and Dam Safety Repair Program
Renovation
Results
$4,000,000 to $15,000,000 est. value
Phoenix, AZ

Little Colorado River Bridge Repairs
Results
Holbrook, AZ 86025

Construct Bridge Scour Countermeasure
Results
Less than $270,000 est. value
AZ

Reported 03/30/2022 12:00 AM
Project Title

AZ FS 24(1) Buffalo Crossing Bridge

Physical Address View project details and contacts
City, State (County) Duncan, AZ   (Greenlee County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project is located in the Apache-Sitgreaves National forest in western-central Arizona. The terrain is rolling and mountainous with elevations ranging up to 7600 ft. This project consists of replacing an existing bridge structure on Forest Route 24 (MP 10.0) over the East Fork Black River in Greenlee County, Arizona. The existing 3-span bridge’s overall length is 90.0-ft and width (out-out) measures 30.9-ft. The bridge was built in 1962 and sees heavy logging truck traffic. The capacity has deteriorated due to loading and age. The load rating was recently dropped making this a candidate for replacement. The adjacent sections of roadway will also be reconstructed to match a new a raised bridge elevation. The project consists of a single construction schedule (Schedule A).

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents