Similar Projects
Z--Zion 274111 - Bridge Preservation, Zion National Park
Design
$1,000,000 to $5,000,000 est. value
Springdale, UT 84767

SR-154 Over 3600 W Deck Preservation (0C-815)
Bidding
$500,000 to $1,500,000 est. value
UT

FA-2234; Magna Bridge Replacments, 035031F 035033F
Post-Bid
$500,000 to $1,500,000 est. value
UT

Little Valley Road Bridge Replacement Project
Post-Bid
Heber, UT 84032

Mud Creek and Winter Quarters Creek Road and Bridge Abutment Construction Project
Results
Price, UT

Construction of Two (2) Bridges
Results
Cedar City, UT 84720

River Bridge Event Center
New Construction - 7,615 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Spanish Fork, UT

Recapture Creek Bridge - 037004C
Post-Bid
$500,000 to $1,500,000 est. value
UT

US-191; North Moab to Colorado River Bridge
Results
$15,000,000 to $20,000,000 est. value
UT

Mcelmo Creek Bridge - 037012C
Post-Bid
$1,500,000 to $3,000,000 est. value
UT

Red Butte Garden Upper Creekside Walk Bridges Trail
Results
Less than $1,068,315 est. value
Salt Lake City, UT 84108

West Cache Canal Screening Project
Post-Bid

Foothill VMS; Southbound Traveler Information
Results
Less than $500,000 est. value
UT

UDOT Bridge Maintenance Avl
Term Contract
Post-Bid
West Valley City, UT

State Street Pedestrian Bridge Removal
Results
Murray, UT 84107

Reported 08/13/2020 12:00 AM
Project Title

Bridge Deck Repair on I-15

Physical Address View project details and contacts
City, State (County) Cedar City, UT 84720   (Iron County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor will remove isolated areas of the asphalt overlay as defined by the Engineer. Removed asphalt overlay tailings will be the property of the contractor and hauled away by the contractor. The Contractor will remove the overlay without damaging the concrete deck. The contractor is responsible for any damage caused during the removal of the overlay. Perform structural pothole patching (full depth) utilizing Rapid Setting Hydraulic Cement -3/4 inch mix, install a waterproofing membrane,and replace the HMA.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents