Similar Projects
Reported | 08/13/2020 12:00 AM |
Project Title | Bridge Deck Repair on I-15 |
Physical Address | View project details and contacts |
City, State (County) | Cedar City, UT 84720 (Iron County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contractor will remove isolated areas of the asphalt overlay as defined by the Engineer. Removed asphalt overlay tailings will be the property of the contractor and hauled away by the contractor. The Contractor will remove the overlay without damaging the concrete deck. The contractor is responsible for any damage caused during the removal of the overlay. Perform structural pothole patching (full depth) utilizing Rapid Setting Hydraulic Cement -3/4 inch mix, install a waterproofing membrane,and replace the HMA. |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |