Similar Projects
Roof Replacement
Renovation
Sub-Bidding
$138,700 CJ est. value
Elk River, MN 55330

BMX Arena Roof Replacement
Renovation
Sub-Bidding
$700,000 CJ est. value
Isanti, MN 55040

2022 Multi-Site Partial Roof Replacement Oak Land Middle School
Alteration
Post-Bid
Stillwater, MN 55083

Skyberg Hall Roof Replacement
Alteration
Post-Bid
$240,000 est. value
Crookston, MN 56716

Roof Replacement at John Carroll Apartments
Results
South Saint Paul, MN 55075

2021 Saint Paul Campus Roofing
Results
$3,556,806 est. value
Saint Paul, MN 55108

Jie Ming Mandarin Immersion Addition and Renovation - Part 2 Bid Package #1: Roofing
Renovation
Construction
$300,000 CJ est. value
Saint Paul, MN 55116

Replace Roof at License Plate Building MCF St. Cloud
Renovation
Sub-Bidding
$953,480 CJ est. value
Saint Cloud, MN 56304

Becker County Highway Department Facility Roofing Bid Package
Alteration
Post-Bid
Detroit Lakes, MN 56501

Wayzata High School 2022 Partial Roof Rehabilitation
Alteration
Results
Plymouth, MN 55446

Historic Garage Reroof Upper Sanitation Building Reroof
Renovation
Sub-Bidding
$128,250 CJ est. value
Fairfax, MN 55332

Hibbing Tanker Base Shingle Replacement
Alteration
Post-Bid
Hibbing, MN

IHCC-20 Activities Building Roof Replacement
Alteration
Results
Inver Grove Heights, MN 55076

Fairmont Homes MN 3-2 Roofing Replacement
Renovation
Sub-Bidding
$135,000 CJ est. value
Duluth, MN 55802

SCTCC-21-G-Wing Penthouse Roof Repair
Alteration
Post-Bid
Saint Cloud, MN 56303

Last Updated 05/15/2023 07:15 PM
Project Title

FY22 Roof Replacement

Physical Address View project details and contacts
City, State (County) Saint Paul, MN 55107   (Ramsey County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $2,001,694 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Roof Replacements: Groveland Park El, Wellstone El, Johnson Sr Submit for Board Approval (placeholder) April 7 Board Meeting (Approval) April 18, Final date for submitted questions March 24 at 2pm Roof Replacements: Groveland Park El, Wellstone El, Johnson Sr Submit for Board Approval (placeholder) April 7 Board Meeting (Approval) April 18, Final date for submitted questions March 24 at 2pm assess its structural design capacity and its compatibility with the proposed re-roofing project. Our evaluation included the following tasks: o On site observation of the existing framing to verify if existing conditions generally follow the structural drawings for the original building. A walk through of the proposed re-roofing areas was performed on March 4, 2022. o Review of the structural drawings for the original building. Existing drawings for the north stairwells were provided and were prepared by Bergstedt, Wahlberg, Bergquist Associates Architects, dated June 2, 1970. Existing drawings for the Title 1 Federal Programs roof were provided and were prepared by Bergstedt, Wahlberg, Bergquist, Rohkohl Architects, Engineers, and Planners, dated March 15, 1978. o An analysis of the roof structural capacity based on the original building drawings. This analysis was limited to members judged to represent typical framing conditions and capacities for both the Title 1 Federal Programs Roof and North Stairwells. The proposed roofing design parameters are as follows: Title 1 Federal Programs: o The existing roof is a ballasted built-up system weighing approximately 6.85 psf. o The new proposed roof will be an adhered membrane roofing system weighing approximately 2.32 psf. o The roof insulation R value is proposed to increase from 10 R to 30 R. o The existing roof insulation is sloped at 1/8"/ft, and the new roof insulation is proposed to remain at 1/8"/ft. o The elevation difference between new main and overflow drains will be set at 2". The maximum allowable water depth including the head height above the overflow scupper/drains is 7". North Stairwell: o The existing roof is a ballasted built-up/asphalt cap system weighing approximately 6.85 psf. o The new proposed roof will be an adhered membrane roof system weighing approximately 2.32 psf. o The roof insulation R value is proposed to increase from 10 R to 30 R. o The existing roof is sloped heavily along the stair run.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents