Similar Projects
Psja Early College High School Reroofing and Hvac Upgrades
Alteration
Bidding
$12,600,000 est. value
Alamo, San Juan, TX 78589

Child Nutrition Program Freezer Replacement
Alteration
Bidding
$100,000 est. value
Mission, TX 78572

HVAC Refrigerants for Central Supply Warehouse
Post-Bid
Pharr, TX

School District HVAC Air Purification Systems
Post-Bid
Edinburg, Pharr, TX

Zavala Gym Air Conditioner Units
Results
Edinburg, TX 78539

Robert Vela Cooling Tower
Results
Edinburg, TX 78539

Maintenance and Repair of Heating,Ventilating, Air Conditioning and Ice Machine Systems
Alteration
Bidding
Edinburg, TX

HVAC and Mechanical Products
Term Contract
Post-Bid

Barrientes Middle School Gym Air Conditioner Units
Results
Edinburg, TX 78539

HVAC Service and Repair
Alteration
Bidding
Monte Alto, TX

Air Conditioning Units
Post-Bid
Edinburg, TX

Barrientes M.S. Gym Air Conditioner Installation
Results
Edinburg, TX 78539

Air Conditioner Duct Installation for Crawford, Flores/Zapata, Gorena and Ramirez Elementary Schools
Post-Bid
Edinburg, TX 78541

Air Handling Unit Replacements
Results
$2,304,220 est. value
McAllen, TX 78503

Monthly Replacement of A/C Filters
Post-Bid
Hidalgo, TX

Reported 01/01/2022 12:00 AM
Project Title

AC Units Mercedes Field Office USIBWC

Physical Address View project details and contacts
City, State (County) Mercedes, TX   (Hidalgo County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1 - 4 ton and 2 - 5 ton, single phase 208/240 Volt air conditioning system for use in the Mercedes Personnel Building. All labor included in replacement and removal but not disposal of old units. All units should have 12,000 BTUs per ton. Unit with hail guards Unit with proper curb guards Include all permits for job Page 2 of 2 Check entire system for safety and efficiency and tie into existing supply and return air duct system Check and adjust system air flow in building Use existing power panels Use existing roof top mounts Replace air flow registers plastic downward deflection Ensure to place proper sealant around items require to prevent water leakage Update thermostat to standard operation controls and provide operation manual

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents