Similar Projects
Interstate 81 over West Foothills Drive
Infrastructure
Conception
$6,958,544 CJ est. value
Drums, PA 18222

SR 315 over Reading Blue Mt and Northern Railroad
Infrastructure, Renovation
Conception
$2,950,000 CJ est. value
Pittston, PA 18640

SR 1012 over Tributary Harvey's Creek
Demolition, New Construction, Infrastructure, Renovation
Design
$750,000 CJ est. value
Jackson Township, PA 18708

I-80 EB over I-81 NB/SB
Infrastructure
Design
$16,152,468 CJ est. value
Butler Township, PA 18222

HCA Operational Upgrades Part B - Roan Intake Project
Infrastructure
Bidding
$200,000 CJ est. value
Hazleton, PA 18201

2022 Asphalt Paving Project
Infrastructure
Bidding
$300,000 CJ est. value
Bear Creek Township, PA 18702

Headworks Blower Building Project
New Construction - 300 SF
Post-Bid
Less than $500,000 CJ est. value
Hanover Township, PA

Site and Utility Relocation Work in Allen Street
Infrastructure
Post-Bid
Hazleton, PA 18201

Dirt and Gravel Roads Services
Results
Bear Creek Village, PA

2020-2021 Capital Fund Program Modernization Projects - Site Improvements at Nanticoke Terrace Lower
Infrastructure
Results
Nanticoke, PA

New Jersey Central Railroad Train Station Improvement
Renovation - 32,000 SF
Construction
$1,200,000 est. value
Wilkes-Barre, PA 18704

Loomis Roundabout Improvement Project
Construction
Ashley, PA 18701

I-80 over Lehigh River Bridge Project - Pennsylvania Department of Transportation
Demolition, New Construction, Infrastructure
Pending Verification
$52,000,000 CJ est. value
White Haven, PA 18661

Hazelton Beltway Center
New Construction, Infrastructure - 3,948,000 SF
Pending Verification
$426,000,000 CJ est. value
Hazle Township, PA 18202

Rogers Avenue over Solomon Creek
Demolition, New Construction, Infrastructure
Conception
$1,100,000 CJ est. value
Ashley, PA 18706

Last Updated 10/31/2022 05:11 PM
Project Title

HCA Operational Upgrades Part B Raw Water Pump Replacement Project - General/Mechanical and Electrical

Physical Address View project details and contacts
City, State (County) Hazleton, PA 18201   (Luzerne County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $210,000 [brand] Estimate
Plans Available from Electrical Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Clarification Deadline 10/26/2022 2:00 PM In general, the Work includes the removal and replacement of four (4) raw water pumps and associated piping/appurtenances at the HCA Water Treatment Plant. Bids will be accepted for replacement of 4 raw water pumps and all associated piping/appurtenances. A certified check or bid bond drawn to the order of the Hazleton City Authority - Water Department in an amount equal to ten percent (10%) of the bid must be submitted with each proposal as bid security and received at the Authority's Office with all other required bid documents prior to the Bid Opening. Bidders shall comply with all procedures and requirements of the Contract Documents. The Hazleton City Authority - Water Department encourages DBEs, including MBEs and WBEs, to submit a bid proposal. All Prime and sub-contractors shall make the required good faith efforts when subcontracting and shall provide all documents to substantiate their search prior to award. Prior to the award of any Contract, the successful bidder shall furnish to the Owner Certificates of Insurance, Performance Bond, Labor and Material Payment Bond, American Steel certifications, DBE/WBE Compliance Documents, and any other items as required by the Contract Documents. A satisfactory surety shall execute all bonds. Bidders on all work will be required to comply with the Pennsylvania Human Relations Act No. 222. The Commonwealth of Pennsylvania, Department of Labor and Industry and Federal Prevailing Minimum Davis Bacon Wage Determinations, which are included as, part of the Contract Documents. All required wage rates for this project and shall govern all work under this Contract. The Hazleton City Authority - Water Department is an Equal Employment Opportunity Employer. Except as otherwise provided by law, no Bidder may withdraw a bid within sixty (60) consecutive calendar days after the actual date of the bid opening or one hundred twenty (120) consecutive calendar days if the award is delayed by a required approval of another governmental agency, the sale of bonds, or the award of a grant or grants. The Hazleton City Authority is a Pennsylvania Municipal Authority and subject to the Pennsylvania Right to Know Act. All prospective bidders shall execute a swaiver of the Application of the Uniform Electronic Transactions Act, 73 P.S. 2260.101 et seq., and the Electronic Signatures in Global and National Commerce Act, 15 U.S.C.S. 7001 et seq. The Hazleton City Authority - Water Department hereby reserves the right in its discretion, which is understood and agreed to by all bidders, to reject any and all bids submitted, and also reserves the right to waive any irregularities, omissions, mistakes, or informality in the Bidding Process. The Bid, if awarded, will be awarded at the sole discretion of the Authority at the lowest total cost to the best responsive and responsible Bidder based on a final review work to be awarded as selected by the Owner. All bidders must show adequate knowledge, experience and past projects in similar size and complexity. The Work will be substantially completed within 300 days after the date when the Contract times commences to run as approved in Paragraph 2.03 of the General Conditions and completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions within 330 days 1. Raw Water Pump Replacement Project (Contract A - General/Mechanical): Demolish and replace Raw Water Pumps Nos. 1-4 and associated discharge piping, concrete pump pads, and all other appurtenances to make an operational system. Project is located at HCA Water Filtration Plant in Hazleton City, Luzerne County. 2. Raw Water Pump Replacement Project (Contract B - Electrical): Installation of variable frequency drives and electrical/SCADA connections for new Raw Water Pump Nos. 1-4. Project is located at HCA Water Filtration Plant in Hazleton City, Luzerne County.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents