Similar Projects
Drainage Repairs
Bidding
Less than $225,000 est. value

Sidewalk and Drainage Improvements - South Holiday Road
Results
De Funiak Springs, FL

Drainage
Results
Less than $800,000 est. value
FL

Drainage
Results
Less than $220,000 est. value
FL

Hotz Avenue Outfall Construction
Results
FL

Drainage Repairs
Results
Less than $150,000 est. value

Drainage Outfall Repair
Results
Less than $225,000 est. value
FL

Kellogg Bayfront Park Seawall Replacement
Results
Less than $305,000 est. value
FL

County Highway 2A Cross Drain Replacement
Results
Less than $950,215 est. value
FL

Drainage
Results
Less than $500,000 est. value

Drainage
Results
Less than $303,910 est. value
FL

Drainage
Results
Less than $1,387,468 est. value
FL

Grading
Results
Less than $569,180 est. value
FL

Seven Runs Creek Streambank Restoration Project
Results
Less than $139,852 est. value
Bruce, FL 32455

Drainage
Results
Less than $335,077 est. value
FL

Last Updated 03/12/2019 09:44 AM
Project Title

Legion Park Seawall Improvements

Physical Address View project details and contacts
City, State (County) Miramar Beach, FL   (Walton County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description This project is located on the north side of Hwy 98 in Miramar Beach, FL on the south shoreline of Choctawhatchee Bay in Legion Park. The project includes the demolition of the existing steel sheetpile wall, vinyl wall, and concrete cap that are currently in poor condition. The contractor will be responsible for the installation of 356 LF of PZ-22 (or equivalent) coated steel sheetpile wall at the locations shown on the plans. The contractor will also be responsible for installation of a Type D inlet with traffic rated grate and 64 LF of 30" ADS HP pipe that will penetrate the proposed steel sheetpile wall. Additional work includes sodding all disturbed areas and regrading to the bottom of the concrete cap that will be installed with the finished wall. The contractor will also be responsible for removal of the existing 4' timber fence that extends across the park site south of the wall.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents