Similar Projects
Install Emergency Cooling Tower Makeup Water
Design
$500,000 to $1,000,000 est. value
Cape Canaveral, FL 32925

Unit 5 52 Circulating Water Pump Overhaul at Mcintosh Power Plant
Post-Bid
Lakeland, FL 33805

Wells and Pressure Tank Purchase and Installation Services
Post-Bid
Fort Pierce, FL 34945

Replace Chiller and Pumps at USCG Sector Key West, Florida
Results
$250,000 to $500,000 est. value
Big Coppitt Key, FL 33040

New Well 16 Construction and Well 11 Abandonment
Results
Jacksonville Beach, FL 32227

Electric Motor Repair
Post-Bid
Cape Coral, FL 33915

Repair Services for Pumps, Motors, and Other Equipment
Results
Kissimmee, FL 34741

Annual Agreement For Wastewater Pump Station Repair And Renovation
Term Contract
Post-Bid
FL

Raw Water Well #9
Results
Hallandale, FL 33009

SHIP Program Well and Septic Installation
Post-Bid
Macclenny, FL 32063

Saratoga Springs Plant Site Well Construction
Results
Green Cove Springs, FL

Irrigation Well Replacement
Term Contract
Post-Bid
Land O' Lakes, FL 34639

Tank Hill Water Facility Improvements
Results
$2,800,000 est. value
Dade City, FL 33525

Well Pump Motor
Post-Bid
Plant City, FL 33564

Well 15 South Profile Well and Remediation Well R-4
Results
Hobe Sound, FL 33455

Last Updated 12/20/2021 05:08 AM
Project Title

WRF Deep Injection Well Modifications and Monitor Well Replacement

Physical Address View project details and contacts
City, State (County) Stuart, FL 34994   (Martin County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,810,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Modifications to existing injection well (IW-2) installation of a fully cemented fiberglass reinforced plastic (FRP) liner to accept an injection rate of 6,700 gallons per minute (gpm); 9.65 million gallons per day (MGD). The work shall include the installation of wellhead components suitable for the connection and operation of a completed system to accept treated wastewater from the existing WRF and additional flow stream being concentrate from a proposed reverse osmosis (RO) water treatment facility; installation of a new single-zone deep monitor well (DMW-1R) including the installation of wellhead components; plugging and abandonment of an existing monitor well DMW-1; installation of water-table monitor wells that will either be plugged and abandoned in place or completed with flush mounted vaults and lockable caps at the end of the project; repairs to existing concrete slab as needed for well pads; and all electrical, instrumentation, piping, valves, pumps, paving, general civil site, electrical, instrumentation, and other appurtenances to complete a fully functioning system.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents