Similar Projects
Blanchard Circle Mixed Use Buildings
New Construction, Infrastructure - 16,400 SF
Design
$4,000,000 CJ est. value
Wheaton, IL 60189

Mechanical Renovation Project at their Junior High School
Renovation
Sub-Bidding
$2,000,000 CJ est. value
Westmont, IL 60559

2022-2025 Snow Removal Services
Term Contract
Sub-Bidding
West Chicago, IL 60185

East Building Addition Phase II
Addition
Post-Bid
Lincolnshire, IL 60069

7-8 Grade Center Bid Period 2
Renovation
Post-Bid
Glendale Heights, IL 60139

Cloverdale ES New Innovative Center
Renovation
Results
Carol Stream, IL 60188

Lincoln Elementary School - Construction Dumpsters and Toilets
Results
Elmhurst, IL

Montessori School
Build-Out - 18,000 SF
Construction
Naperville, IL 60540

Timothy Christian Schools
Renovation
Pending Verification
Elmhurst, IL 60126

Main Street Train Station Maintenance
Term Contract
Sub-Bidding
Downers Grove, IL 60515

Early Childhood Center
Renovation, Addition
Post-Bid
Villa Park, IL 60181

Transition Building Build Out
Build-Out
Results
Downers Grove, IL 60515

Substation Snow Removal
Term Contract
Sub-Bidding
Naperville, IL 60540

Pre-K at Tioga Elementary School
Addition
Post-Bid
Bensenville, IL 60106

Burr Ridge Ccsd 180 2021 Site Improvements
Renovation
Results
Burr Ridge, IL 60527

Last Updated 08/04/2022 11:06 AM
Project Title

Waste Removal, Recyclable Service, and Food Waste Removal for Composting

Physical Address View project details and contacts
City, State (County) Villa Park, IL 60181   (DuPage County)
Category(s) Education, Single Trades
Sub-Category(s) Elementary School, Middle/Senior High School, Service/Term Contracts
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Any questions or requests for clarifications concerning the bid documents or specifications must be submitted in writing no later than Monday, July 18, 2022, and directed to: School District 45,DuPage County 255 West Vermont Street Villa Park, Illinois 60181 Attention: Jeff Eagan or jeagan@d45.org Bid results will then be submitted to School District 45, Board of Education and DuPage High School District 88, Board of Education for separate consideration by each respective Board. The respective Boards reserve the right to accept or reject any or all bids. Each Board will make a separate determination of the lowest responsive and responsible bidder with respect to that District's scope of work using the methods provided, and on that basis, each Board may award separate contracts for the work. No bids may be withdrawn for a period of 60 days after the bid opening date. The Board of Education reserves the right to waive any immaterial variances or irregularities or reject any or all proposals when, in its opinion, such action will serve the best interest of the Board of Education, School District 45, DuPage County and the Board of Education DuPage High School District 88.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents