Similar Projects
Hilo Wastewater Treatment Plant (WWTP) Rehabilitation and Replacement Project - Phase 1
Renovation
Results
$177,000,000 CJ est. value
Hilo, HI 96720

Electrical and Plumbing Installation
Alteration
Post-Bid
Kaneohe, HI 96744

Dole Middle School - Covered Learning Center
New Construction, Infrastructure
Results
$3,749,632 CJ est. value
Honolulu, HI 96819

Kaneohe Dam Flood Control Improvements
Infrastructure
Post-Bid
$400,000 CJ est. value
Honolulu, HI 96813

Temporary Pumping Connections - Halawa 550 Reservoir
Renovation
Post-Bid
$500,000 CJ est. value
Aiea, HI 96701

Wailuku Waterline Replacement (Lunalilo Street, Liholiho Street, Kamamalu Place, Kalama Place, and Leileihoku Street)
Infrastructure
Results
$4,025,000 CJ est. value
Wailuku, HI 96793

Papohaku Park Restroom Plumbing Improvements
Renovation
Sub-Bidding
$247,000 CJ est. value
Wailuku, HI 96793

Last Updated 06/21/2023 01:06 PM
Project Title

Fender Repairs at Pier 3, Hilo Harbor, Hawaii

Physical Address View project details and contacts
City, State (County) Hilo, HI 96720   (Hawaii County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $1,744,418 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work consists of repairing existing concrete haunches and tire fender system including tire fenders, lagging, wales, blocking, bolts, grommets, chains, hardware, and other appurtenances for the entire Pier 3 at Hilo Harbor. Mobilization and Demobilization. Removing and disposing of existing tire fenders, lagging, wales, blocking, hardware, and other incidental items required to be replaced, in a lawful manner. Furnishing and installing new tire fender system including tire fenders, lagging, wales, blocking, bolts, grommets, chains, hardware, and other incidental items required to complete the fender system. Concrete Haunch Full Repairs including removal and disposal of the existing reinforced concrete haunch; installing new reinforcing steel; and preparing for, forming, and installing a new concrete surface. Concrete Haunch Spall Repairs including removal and disposal of a portion of reinforced concrete haunch; installing reinforcing steel; preparing for, forming, and installing new concrete mortar. Contract Start and End Date shown in the HIePRO solicitation are estimates. The exact dates shall be provided by written notice from the Harbors Division Construction Engineer. The estimated cost of construction is between $750,000 and $850,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Questions Deadline: 5/24/23 at 2:00 PM

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents