Similar Projects
Water Station Electrical Improvements - Pump and Motor Replacement - All Stations
Infrastructure
Conception
$2,566,741 est. value
Schaumburg, IL

Well No. 22 (Division A)
Infrastructure
Bidding
$45,000 est. value
Normal, IL

Well No. 22 (Division B)
Infrastructure
Bidding
$45,000 est. value
Normal, IL

Engineering, Design, and Construction Services for New Deep Well #19
Post-Bid
Crystal Lake, IL

East Stl Bp 12 Phase 1 Relief Wells
Post-Bid
$10,000,000 to $15,000,000 est. value
Madison, IL

Chemical Treatment of Deep Wells
Results
East Saint Louis, IL

Chemical Treatment of Deep Wells
Results
East Saint Louis, IL

New Wells No. 8 and No. 9
Infrastructure
Bidding
$2,000,000 est. value
Morris, IL

Purchase of Valves and Actuators for Wells 10 and 16
Post-Bid
Crystal Lake, IL

Mainstream Tarp Pumps Rehabilitation
Results
$19,484,000 to $23,585,000 est. value
Hodgkins, IL 60525

Water Well No. 9 Rehabilitation
Infrastructure
Bidding
$2,000,000 est. value
Elk Grove Village, IL

Alaris IV Pumps
Post-Bid
Chicago Heights, IL

New Water Treatment Plant for Well House No. 11
New Construction
Results
Freeport, IL

Furnish and Deliver Sump Pumps to Various Locations for a One-year Period
Term Contract
Bidding
$38,000 est. value
Chicago, IL

Procurement Services Office
Post-Bid
Naperville, IL

Reported 05/26/2022 12:00 AM
Project Title

Well No. 4 (610-111)

Physical Address View project details and contacts
City, State (County) Pittsfield, IL   (Pike County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $436,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: This project is for the drilling, development, and installation of Well #4 and relocating well pump controls and electrical from Well #2, along with raw waterline piping modifications. This project also includes the abandonment of Well #2, once Well #4 is brought on-line. Bids are requested for the following Contract: Well No. 4 (610-111) The Project has an expected duration of 200 days. There will be no pre-bid conference for the Project. All Contracts for the construction of public works are subject to the Illinois Prevailing Wage Act (820ILCS 130/1-2). Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All iron and steel products used in this project must be produced in the United States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials, The De Minimis, minor components, pig iron and direct reduced iron waiver apply to this contract. Bid security shall be furnished in accordance with the Instructions to Bidders. The award of Contracts on this project shall be predicated upon competitive bidding, with award being made to the lowest responsive, responsible bidder. Said lowest Bidder(s) shall be determined for each Contract by summarizing the applicable low base bid(s). The owner reserves the right to waive any informalities or to reject any or all bids. No bidder may withdraw his bid within 90 days after the actual date of the opening thereof

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents