Similar Projects
Terminal Space Optimization Project
New Construction
Results
Nantucket, MA

Owners Projects Manager (OPM) for Crew Quarters Project
New Construction
Results
Nantucket, MA 02554

FY22 Airport Operations Modifications and T Hanger Project - General Bids
Renovation
Results
$4,800,000 est. value
Barnstable, MA

FY22 Airport Operations Modifications and T Hanger Project - Filed Sub-Bids
Renovation
Results
$4,800,000 est. value
Barnstable, MA

Taunton Municipal Airport New Administration Building - General Bid
New Construction - 5,500 SF
Results
$5,600,000 est. value
East Taunton, MA 02718

Taunton Municipal Airport New Administration Building - Filed Sub-Bids
New Construction - 5,500 SF
Results
Less than $6,465,835 est. value
East Taunton, MA 02718

Fall River Terminal Plaza Concrete Decking - General Bid
Renovation
Post-Bid
Fall River, MA 02721

Fall River Terminal Plaza Concrete Decking - Filed Sub Bid
Renovation
Results
Fall River, MA 02721

Boston Baggage Room
Renovation
Post-Bid
Boston, MA 02111

Symphony Station Accessibility Improvements
Bidding
$20,000,000 est. value
Boston, MA

Norwood Airport Observation Area
New Construction
Results
$158,000 est. value
Norwood, MA 02062

Boston Logan International Airport Terminal E Lounge
Renovation
Post-Bid
Boston, MA

Southbridge Municipal Airport Improvements
Post-Bid
Southbridge, MA

Main Entrance and Secondary Egress
New Construction, Renovation
Conception
$1,150,000 est. value
Newton, MA 02460

Last Updated 05/10/2022 12:45 AM
Project Title

Replacement of Backflow Preventer

Physical Address View project details and contacts
City, State (County) Nantucket, MA 02554   (Nantucket County)
Category(s) Transportation
Sub-Category(s) Airline/Passenger Terminal
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of a transportation facility in Nantucket, Massachusetts. Completed plans call for the renovation of a transportation facility. The Nantucket Memorial Airport, acting through its Airport Commission ("Airport"), is seeking Quotes for Replacement of Backflow Preventer. Questions concerning this Quote Process must be submitted in writing no later than 12:00 P.M., Wednesday, April 20, 2022, to Katy Perales, Nantucket Memorial Airport, 14 Airport Rd, Nantucket, MA 02554. E-mail questions to kperales@nantucketairport.com. The Airport reserves the right to reject any or all quotes or to cancel this Quote Process if it deems it to be in its best interest to do so.

Details

Airline/Passenger Terminal, Renovation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents